T-211和S-211,125磅级青铜截止阀T-211 & S-211 Class 125 Bronze Globe Valves
螺纹旋进阀盖 • 整体阀座 • 可更新阀座和阀瓣Screw-in Bonnet • Integral Seat • Renewable Seat and Disc
125 PSI/8.6 Bar饱和蒸汽高达178oC
200 PSI/13.8 Bar非冲击性冷工作压力
125 PSI/8.6 Bar Saturated Steam to 353oF/178oC
200 PSI/13.8 Bar Non-Shock Cold Working Pressure
符合MSS SP-80标准
CONFORMS TO MSS SP-80
材料清单
MATERIAL LIST 部件
PART规格说明
SPECIFICATION1.手柄螺母
Handle Nut300系列不锈钢
300 Series Stainless Steel2.标志牌
Identification Plate铝
Aluminum3.手轮
Handwheel可锻铸铁ASTM A 47
Malleable Iron ASTM A 474.阀杆
Stem硅青铜ASTM B 371合金C69400/C69430
Silicon Bronze ASTM B 371
Alloy C69400/C694305.填料压盖
Packing Gland青铜ASTM B 62或ASTM B 584
合金C84400或黄铜ASTM B 16
Bronze ASTM B 62 or ASTM B 584
Alloy C84400 or Brass ASTM B 166.填料螺母
Packing Nut青铜ASTM B 62或ASTM B 584
合金C84400或黄铜ASTM B 16
Bronze ASTM B 62 or ASTM B 584
Alloy C84400 or Brass ASTM B 167.填料
Packing含石墨的芳族聚酰胺
Aramid Fibers with Graphite8.阀盖
Bonnet青铜ASTM B 62
Bronze ASTM B 629.阀瓣固定装置螺母
Disc Holder Nut青铜ASTM B 140合金C31400或B 62
Bronze ASTM B 140
Alloy C31400 or B 62*10.阀瓣固定装置
Disc Holder青铜ASTM B 62
Bronze ASTM B 62*11.阀座阀瓣
Seat Disc水,油或气
蒸汽 (TFE) (Y)
Water, Oil or Gas
Steam (TFE) (Y)*11a.阀座阀瓣
Seat Disc青铜ASTM B 62 (B)
Bronze ASTM B 62 (B)12.阀瓣螺母
Disc Nut青铜ASTM B 62/ASTM B 98
合金C65100配置不锈钢垫圈
Bronze ASTM B 62/ASTM B 98
Alloy C65100 w/SS Washer13.阀体
Body青铜ASTM B 62
Bronze ASTM B 62注意:S-211不配置(B)阀瓣
* 青铜阀瓣不需要阀瓣螺母。如果要将(B)阀瓣转换成(Y)阀瓣,需要订购阀瓣螺母(12)和阀瓣固定装置(10)和适当的阀瓣(11)。
Note: S-211 not available with (B) Disc.
* The Bronze Disc does not require a Disc Nut. When converting from (B) Disc to (Y) Disc, order Disc Nut (12) and Disc Holder (10) and proper disc (11).
http://www.h6688.com/valve/nibco/040531/02/img/0040_2.gif
http://www.h6688.com/valve/nibco/040531/02/img/0210_1.jpg
T-211
螺纹连接
Threaded
http://www.h6688.com/valve/nibco/040531/02/img/0210_2.jpg
S-211
焊接连接
Solder
http://www.h6688.com/valve/nibco/040531/02/img/0210_3.gif
T-211-Y
NPT x NPT
http://www.h6688.com/valve/nibco/040531/02/img/0210_4.gif
T-211-B
NPT x NPT
http://www.h6688.com/valve/nibco/040531/02/img/0210_5.gif
S-211-Y
C x C
结冰气候预防 - 检测管线系统后,阀门应该处于开启状态,做到排泄完全充分。
Freezing Weather Precaution – Subsequent to testing a piping system, valves should be in an open position to allow complete drainage.
◆ 如果需要工作压力的详细资料,请参阅第109页的压力温度表。
◆ For detailed Operating Pressure, refer to Pressure Temperature Chart on page 109.
尺寸 - 重量 - 数量
DIMENSIONS—WEIGHTS—QUANTITIES通径
Size尺寸
DimensionsT-211S-211大箱数量
Master
Ctn. Qty.ABC英寸
In.毫米
mm.英寸
In.毫米
mm.英寸
In.毫米
mm.英寸
In.毫米
mm.磅
Lbs.公斤
Kg.磅
Lbs.公斤
Kg.T-211S-211*1/8†62.38603.38861.81461.010.460.980.445050*1/4†82.38603.38861.81461.000.450.940.435050*3/8†102.38603.38861.81460.980.450.930.425050*1/2†152.56653.38861.69431.030.470.950.4350503/4203.06784.881242.25571.730.791.800.8230301253.69945.691452.81722.851.292.871.30202011/4324.311106.131563.06783.791.723.551.61101011/2404.691197.381873.56915.902.685.702.5810102505.631437.942024.441138.683.948.914.046421/2656.6316810.192595.2513315.406.9815.927.22223807.7519711.192846.5016522.4410.1821.329.6722
页:
[1]