单词(默认显示当天的) |
采取的措施 |
9Q |
|
8J |
|
43 |
|
U4 |
|
6U |
|
L9 |
|
Y5 |
|
CApage=2 |
|
low pressure system |
|
slats |
|
reverted |
|
recerted |
|
ruuber |
|
elacs |
|
RIDAO |
|
supsonic |
|
subjected |
|
PAD UP |
|
PADUP |
|
BAC5730 |
|
Heat Treat Aluminum Alloys |
|
Latched |
|
pile fasteners |
|
AND FULL |
|
ANDFULL |
|
exposed on |
|
positioned |
|
Velcro |
|
grommets |
|
火焰导向器 |
|
FIRE detection |
|
attachment line |
|
HALVES. |
|
GIRT HALVES. |
|
the master caution illuminated |
|
redispath |
|
flag aie carrier |
|
d/h |
|
LDD |
|
music instruments |
|
nose tire |
|
stand kit |
|
yoke stand |
|
center post |
|
bleed isolation |
|
航站楼 |
|
avoidness |
|
firestation |
|
Rating Application |
|
转接盒 |
|
试验转接盒 |
|
地面试验转接盒 |
|
空气管理系统地面试验转接盒 |
|
L/G Up Lock |
|
DRY snow |
|
分任务 |
|
APPLICABLE TO SERVICE BULLETIN REVISION 0 DATED Jul 01/05 |
|
勤务项目 |
|
The instructions herein are based on the premise that the slide/ |
|
AIR CONDITIONING - FLOW CONTROL VALVE PNR 1303A0000-03, 1303A0000-03 |
|
Block Fuel |
|
high impeller |
|
soley |
|
terminated |
|
Lavator |
|
tiller input |
|
instructed |
|
tilter input |
|
活门限位开关 |
|
sleeve bushing |
|
气流噪音 |
|
roung |
|
hull loss |
|
contact test tool |
|
ganerate |
|
diameters |
|
oversize relief |
|
oversize relief valve |
|
motion simulator |
|
vapor add |
|
vapor added |
|
fin comb |
|
bent fins |
|
pilot evaluation |
|
demo flight |
|
backing bracket |
|
chord line of wing |
|