单词(默认显示当天的) |
采取的措施 |
thumb−wheel |
|
looking out window |
|
Andros Town |
|
ta/ra |
|
inent |
|
indnt |
|
close-in capture |
|
smoke hood |
|
tiontion |
|
centrcl |
|
pressure datum |
|
contant atmospheric pressure |
|
mainntenance |
|
upwind end |
|
wheel bay |
|
distance-to-station |
|
portion of flight |
|
requested height |
|
surface below aircraft |
|
crew performance |
|
specified datum |
|
Conformal With |
|
aircraft height |
|
land position |
|
空管雷达信标系统 |
|
dataloader |
|
hold short procedure |
|
routine operaton |
|
routin operation |
|
hardmare |
|
反射式雷达 |
|
雷达原理 |
|
leg sequence |
|
stats |
|
activoty |
|
meter fixes |
|
meter fixex |
|
For each arrival aircraft in the system, McTMA computes the undelayed estimated time of arrival (ETA) to meter fixes, final approach fix and runway threshold. |
|
operatonal |
|
staggered approaches |
|
interctive |
|
THR. |
|
final-interception |
|
final-interception points |
|
crosshairs |
|
operational credit |
|
crosshairdisplay |
|
cues |
|
ceramic alumium oxide(30%)with white pure alumium oxide |
|
LNAV/VNAV |
|
jatway |
|
shock-induced |
|
Combustion Ramjet |
|
咨询通过 |
|
Proof-of-Principle |
|
l acc |
|
HLG |
|
dsch |
|
inet |
|
actve |
|
S-ILS |
|
reverted |
|
民航的 |
|
风突然急剧变化 |
|
Buyant-Ukhaa |
|
阵性的 |
|
Argentinea |
|
高空急流 |
|
surrounded |
|
大气乱流 |
|
山地背风波 |
|
晴空乱流 |
|
universal fitting |
|
emriates |
|
air berlin |
|
DATALINK |
|
Datalink departure clearance |
|
办公设施 |
|
dimentional |
|
conditionng |
|
dimention |
|
bdimention |
|
b dimention |
|
Designation of specifications |
|
Designation of RNP and RNAV specifications |
|
站坪保障室 |
|
hing |
|
aborted take off |
|
stobed |
|
push-button-annunciation |
|
fan blade spacer shim |
|
bulkhd |
|
invalld |
|
bussing plug |
|
bouding jumper |
|
bounding jumper |
|
dtcu |
|
statused |
|
controllerl |
|
Routes |
|
EDDFYDYC |
|
OPTMFR |
|
produced |
|
Sand blast cabinet |
|
static wick |
|
descripton |
|
industrial marking |
|
de-compile |
|
de-compiled |
|
air drive jet |
|
copyright, |
|
cutoff lever |
|
wheel half |
|
reb |
|
reb fee |
|
documems |
|
Styled |
|
IFR flights |
|
data shown only |
|
marshallers |
|
en-route |
|
supplemental type certificate |
|
VLD ON FLT |
|
EX SIN VLD ON FLT |
|
Vent stringer |
|
extnded |
|
hardware build |
|
virtual build |
|
AviN |
|
AviNet |
|
AviNe |
|
SUPPLEMENTAL DATA |
|
rehardening |
|
SUMMATION UNIT |
|
STRUCTURAL MEMBER, |
|
STICK NUDGER |
|
unfactored |
|
一次性 部件 |
|
SQUAT SENSOR |
|
pack off light |
|
lower landing minimum |
|
zone inlet duct temperature |
|
Individual zone temperature |
|
正常率 |
|
放行正常率 |
|
FWGC |
|
Creation Standard |
|
pilot attitude |
|
piloting attitude |
|
Design Creation Standard |
|
unsafe piloting attitude |
|
deflat |
|
SOUND SUPPRESSION LINER |
|
configuation |
|
configeration |
|
swab cotton |
|
SIMPLIFIED FLIGHT PLANNING |
|
baggage hall |
|
Master Process Plan |
|
SIDE COWL |
|
electrical smell |
|
SENSOR ACTUATOR |
|
Fix Information |
|
pop out window |
|
isobaer |
|
restain |
|
Appearance Group |
|
Materials/Appearance Group |
|
STAFF VISIBILITY |
|
aritic |
|
主动向台飞行 |
|
风修正角 |
|
Service .v. |
|
Service .v. Product |
|
Process Specification Departure |
|
hydroplan |
|
hudroplan |
|
1 |
|
drawthrough |
|
draw through |
|
draw-through |
|
to course |
|