航空论坛_航空翻译_民航英语翻译_飞行翻译

标题: 波音-737(BOEING-737)飞机维护手册——第75章——空气 [打印本页]

作者: 航空    时间: 2011-7-29 21:01:29     标题: 波音-737(BOEING-737)飞机维护手册——第75章——空气

波音-737(BOEING-737)飞机维护手册——第75章——空气

空气(AIR)

发动机保护(ENGINE PROTECTION)

发动机防冰(ENGINE ANTI-ICING)

附件冷却(ACCESSORY COOLING)

压气机控制(COMPRESSOR CONTROL)


作者: 航空    时间: 2011-7-29 21:10:37

AIR.................................................................................................................................. 75-00
Description and Operation
ENGINE PROTECTION
ENGINE GRAVEL PROTECTION SYSTEM.........................................................*[1] 75-09-100
Description and Operation
Engine Gravel Protection Boom
Engine Gravel Protection Pressure Switch
Engine Gravel Protection Valve
Trouble Shooting
Adjustment/Test
Engine Gravel Protection Valve..........................................................................*[1] 75-09-111
Removal/Installation
ENGINE ANTI-ICING
ENGINE AND NOSE COWL ANTI-ICING .................................................................. 75-11-0
Description and Operation
Engine Anti-Icing Air Valve
Engine Anti-Icing Air Orifice
Nose Cowl Anti-Icing Air Valve
Nose Cowl Anti-Icing Thermostatic Valve
Removal/Installation
Adjustment/Test
Inspection/Check
Engine Anti-Icing Shutoff Valve ............................................................................... 75-11-11
Removal/Installation
Nose Cowl Anti-Icing Shutoff Valve and Thermostatic Valve .................................. 75-11-21
Removal/Installation
Anti-Icing Air Rear Tube........................................................................................... 75-11-41
Removal/Installation
Anti-Icing Air Front Tube .......................................................................................... 75-11-51
Removal/Installation
ACCESSORY COOLING
GENERATOR COOLING............................................................................................ 75-21-0
Description and Operation
BOEING PROPRIETARY - Copyright © - Unpublished Work - See title page for details.
Subject Subject No.
COMPRESSOR CONTROL
COMPRESSOR BLEED SYSTEM ............................................................................. 75-31-0
Description and Operation
Inspection/Check
Start Bleed Control Valve......................................................................................... 75-31-01
Removal/Installation
Pressure Ratio Bleed Control .................................................................................. 75-31-11
Description and Operation
Removal/Installation
Pressure Ratio Bleed Control Metering Plug ........................................................... 75-31-12
Removal/Installation
作者: wbm0724    时间: 2014-3-28 08:39:01

谢谢楼主分享
作者: thugstools123L    时间: 2016-5-19 00:02:04

十五字十五字十五字十五字十五字




欢迎光临 航空论坛_航空翻译_民航英语翻译_飞行翻译 (http://bbs.aero.cn/) Powered by Discuz! X2