| 单词(默认显示当天的) |
采取的措施 |
| upper controlol |
|
| turbin blades |
|
| surface area nautical |
|
| 经试车 |
|
| 质量控制方法 |
|
| 指令单 |
|
| 中起落架 |
|
| Cental Landing Gear |
|
| Central Landing Gear |
|
| OVERHEAD CRANES |
|
| 一边机翼 |
|
| 刹车蓄压气 |
|
| se RVR |
|
| forks flush |
|
| td rvr |
|
| HUMMING SOUND |
|
| HOOTING |
|
| Rtdl |
|
| 注油润滑 |
|
| drip out |
|
| RESERVOIR TANK |
|
| 地面收放 |
|
| 收放 |
|
| FREE LEAK |
|
| LEAK−FREE |
|
| 清空 |
|
| 飞行中故障 |
|
| lrcx |
|
| Temp-Plate |
|
| visiblemoisture |
|
| auto metar |
|
| FPDM |
|
| low-collateral-damage |
|
| DUMP / PURGE |
|
| THE FOLLOWING RULES APPLY PER PRICING UNIT |
|
| WAIVED FOR DEATH OF PASSENGER OR FAMILY MEMBER |
|
| CHARGE EUR 120.00 FOR CANCEL-SHOW/REFUND |
|
| Cherrymax Blind Rivet |
|
| 叶片吹风机 |
|
| 高压空气设备 |
|
| OIL FUEL HEATER |
|
| OIL-FUEL HEATER |
|
| OIL-TO-FUEL HEATER |
|
| infractions |
|
| PAPI Lighting |
|
| location antennas |
|
| aircraft tailstrike |
|
| BLEED DELIVERY |
|
| 通话联系 |
|
| highs aloft |
|
| RETS |
|
| licences |
|
| application licences |
|
| spherical pad |
|
| blanding cap |
|
| gerenel |
|
| 放油堵头 |
|
| light chop |
|
| check air man |
|
| 隔离包 |
|
| down-hill |
|
| SELF BLEEDING |
|
| 长途汽车站 |
|
| assigne |
|
| FLOW EVIDENT |
|
| accomplishing |
|
| 尾喷 |
|
| disintegrated |
|
| wiring off |
|
| wire off |
|
| route planing |
|
| 支柱弹簧 |
|
| 装机件 |
|
| 尾喷气流 |
|
| make published missed approach |
|
| make published |
|
| published missed approach |
|
| published miss approach |
|
| 释放机械装置 |
|
| rolled out |
|
| cocrp |
|
| cocrpttcall |
|
| cocrptt |
|
| duide |
|
| 取水位置 |
|
| global RAM |
|
| STALF |
|
| STALLF |
|
| nuisance fault |
|
| 评估材料 |
|
| 住宿费用 |
|
| artificial horizont |
|
| artificial horizonts |
|
| horizonts |
|
| attitude indicators |
|
| 侵害人 |
|
| 压力减压器 |
|
| lavmaini |
|
| 出口标识 |
|
| compensator cartridge |
|
| 图解线路 |
|
| 图示线路 |
|
| onvoic |
|
| CORRECT TUBE |
|
| DANGEROUSLY HIGH |
|
| 可疑或违禁品 |
|
| A C N |
|
| EFOA |
|
| 保安工作的能力 |
|
| 监督管理人员 |
|
| chiefy |
|
| GRIND SEGMENTS |
|
| SOCKET HD |
|
| TURBINE TIP |
|
| check for |
|
| CHECKFOR |
|
| Ice Protection |
|
| DOES ENGINE |
|
| weather balloon |
|
| 以 方式 |
|
| 集油腔 |
|
| PITOT PROBE HEATER |
|
| 每2年 |
|
| operating limitation |
|
| opetating limitation |
|
| VALVE FILTER |
|
| STARTER VALVE FILTER |
|
| regular instruments |
|
| supplied |
|
| pylon geometry |
|
| MUFFLER INSULATION |
|
| EXHAUST-MUFFLER INSULATION |
|
| equilibrum |
|
| remain effective |
|
| remains effective |
|
| ULOL |
|
| that is not damaged on each side of the damaged baybay |
|
| There must be 1 bay |
|
| There must be 1 bay that is not damaged on each side of the damaged bay |
|
| deflat |
|
| 近气 |
|
| tailored support |
|