- 注册时间
- 2011-11-30
- 最后登录
- 2011-11-30
- 在线时间
- 0 小时
- 阅读权限
- 10
- 积分
- 0
- 帖子
- 2
- 精华
- 0
- UID
- 10954

|
Installation of the wheel
9 R9 i) O6 D) L' l/ P* P+ o! v; J
(a) Clean the inner surface of the wheel bearings (surface that touches the axle). Do not apply grease on these surfaces. . ~! M7 R. i* G8 Q8 M) b9 k
: C Z" R/ n, }7 h# H) Q* l9 w0 N
(b) Install the wheel, with the valve outboard, with a handling tool. ) w2 @# n/ K0 W: B
(c) Remove the PROTECTOR NLG (J47548) & L! W$ S/ M- D, |5 |; G: K A
: w8 n3 R/ K% V% R' O (d) Apply a light coat of Material No. 04-004* (COMMON GREASES) or Material No. 04-022* (COMMON GREASES) or Material No. 04-035* (COMMON GREASES) on the axle.
# P6 u1 c% h: X2 r0 G+ b8 Y5 j
- c; K' c* X/ J; R1 [7 ]& a(e) Install the axle nut (10).
) [1 h8 ]: u5 c3 t; @7 ]0 }
% E3 E- X+ W* l(f) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 21.80 m.daN (160.77 lbf.ft) with the ADAPTOR NLG (J47549) . . D V; _8 Z& F& {) j g) O! k
0 E+ e+ \/ s7 Q9 u6 b# l$ p. d3 S* T
(g) Prevent rotation of the wheel and loosen the axle nut (10). 7 Q$ g% i v- f; R: {
; Z" [- `5 V" g1 I3 I(h) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 10.85 m.daN (80.01 lbf.ft).
" ?+ c# e8 L, \( H1 u1 M. Q& N* n5 i. w0 a
(i) Tighten the axle nut (10) until the holes for the bolts (5) are aligned.
/ v/ t" I7 d: ?0 Z$ {3 D
( ]0 O8 `9 j* V- W1 \+ T5 K(j) Turn the wheel and make sure that the wheel is installed correctly. 8 U4 `) [ w: k4 s- f! ]7 Q
. O# M* b3 k& J4 H) W& O
(k) Install the casing (9). # j E, i* H& T1 ?! e2 e
5 j2 K0 a2 {# X
(l) Install the bolts (5), the washers (2) and the new IPC-CSN (32-21-13-03-070) nuts (3) . , o T: C; @: y9 W4 X y
; S) ?/ ]; t/ o5 \; C(m) TORQUE the nuts (3) to between 0.4 and 0.45 m.daN (35.40 and 39.82 lbf.in) and safety them with the new IPC-CSN (32-21-13-03-060) cotter pins (4) . * e; h8 { Y- D5 N; W( F# \
这是前轮安装工卡 请问红色的那句话怎么翻译 谢谢。 |
|