单词(默认显示当天的) | 采取的措施 |
skipping value | |
PRE-GE-SB | |
distributing time | |
Polished Spinner | |
through service | |
though service | |
Flammability Property | |
场景交互技术 | |
三维立体成像技术 | |
resistor probe | |
probeprobe | |
交互跟踪系统 | |
radar augmentor beacon system | |
final frame bit | |
跟踪交互系统 | |
Heavy-Duty Rust Inhibitor | |
虚拟投影设备 | |
三维虚拟投影设备 | |
接口系统 | |
图像生成系统 | |
polyurethane topcoat | |
maintenance aircraft | |
quick donning oxygen mask | |
quick donning oxyen mask | |
虚拟飞机 | |
维护虚拟飞机 | |
桌面训练器 | |
飞行桌面训练器 | |
程序训练器 | |
综合程序训练器 | |
ASSY-SELF | |
designate area | |
DOA\ | |
degree elbow | |
in rate of | |
fairte | |
fairting | |
warm flow indicator | |
contained fuel | |
cantains | |
some of the equipment used to cure these repairs can cause a fiae or an explosion when used near an airplane that contains or has contained fuel | |
FUEL CONDITION CONTROL MOTOR ACTUATOR | |
internal oil fire | |
supplemental drain line | |
fiberglass ply | |
fiberglass isolation ply | |
overall system capacity | |
points up | |
arrow on | |
DETECTOR-COMBUSTIBLE GAS | |
doam | |
sort rate | |
below out | |
charg | |
发动机密集 | |
发动机密集显示 | |
Consolidation of Processes | |
A mechanic performs a 100-hour inspection and approves the aircraft for return to service on January 1. The following January, another mechanic inspects the aircraft and the owner reports to the FAA that an airworthiness directive was due and not complied | |
not complied with at the time of the previous inspection | |
A mechanic performs a 100-hour inspection and approves the aircraft for return to service on January 1. The following January, another mechanic inspects the aircraft and the owner reports to the FAA that an airworthiness directive was due and not complied | |
Fundamental Design Principle | |
mercury spill | |
screening module | |
blended out | |
protective covers | |
SFLRF | |
setting data | |
Precautions | |
On-wing inspection | |
step-aside gearbox | |
precations | |
vmanuel | |
themocouple | |
tag reader | |
data buses | |
aviation transport and regional | |
零下2度 | |
data change validation | |
Vertical Intention | |
机务用房 | |
Customs screening process | |
Maintenance space | |
LTITUDE | |
Sheared starter | |
火电门 | |
火电门连续 | |
点火电门连续 | |
Mass of the bird | |
SPL-2433 | |
High Speed Delivery system | |
fixed airport fuel hydrant | |
mobile tanker | |
air-driven booster pump | |
Low-range Leak Test | |
Terminal Concourse | |
pitot static | |
electric or air-driven booster pump | |
Fill Field | |
SPINNERS | |
fuel-tight compartment | |
rubbery sealant | |
FUEL SPAR VALVE ENG 1 | |
gravity filler | |
aviation-grade petrol | |
long-range airliner | |
check-in island | |
Glare Analysis | |
空地逻辑 | |
FUEL SPAR VALVE | |
Start Of Transmission | |
主轮接地 | |
ALTN PWR | |
ALTN PWR CHAN B | |
cross-over functionality | |
local issue | |
spars | |
bonded skin | |
bond skin | |
solar access | |
Extraction interrogation | |
ILLUSTRATED | |
结合检修 | |
定检 | |
terminal | |
Full Reverser Throttle stop | |
aeraion | |
make-up position | |
chocks | |
航前 | |
check-in assignment | |
EGT-proportional | |
pelent | |
recepttacle | |
FLOW CTL | |
entrapp | |
生存训练 | |
应急生存训练 | |
conventional broadcast word | |
2011年12月9日 | |
threat containment unit | |
modified procedure | |
requiremet | |
lower ceiling | |
采购工程师 | |
consulte | |
multiple word packet | |
passenger experience | |
data-transparent | |
aloft、 | |
where goods will be used or | |
维修方案 MP | |
Purpose of the Goods | |
Specific location where goods will be used or | |
用于民航飞机维修 | |
Flite fone | |
RAM DEFLECTOR | |
interrupt procedures | |
bag tracking accuracy | |
terminals | |
sortation | |
exped | |
application peer | |
VALVE-CHECK | |
自动驾驶仪 断开 | |
worldwide industry leading know-how | |
1st Threshold | |
速度 节 | |
五边 | |
low pressure airmix | |
storyline | |
DP1 | |
thwemal | |
first increment | |
carry matches | |
arry matches | |
Higher-Layer Entity | |
metal distortion | |
气流流向 | |
proper radius | |
离心级 | |
齿轮级 | |
twisted lines | |
cracked fitting | |
pilot valves | |
yaw ball-type | |
短停 | |
venting point | |
飞机引气 | |
photogiaphic | |
ENG FADEC GND PWR 1 | |
end-of-travel | |
artificial feel relays | |
[points | |
pilot owner | |
旅客用氧工作 | |
请参见附件 | |
SMDIE | |
He went on by train after the plane was grounded on account of the fog | |
普通翼 | |
Frame Containing | |
such to | |
另见 | |
non-rechargeable | |
negotiation capability | |
Continental engines | |
omniseals | |
飞后 | |
螺纹滑丝 | |
MASTER VALVE MANIFOLD | |
thread crossed | |
切向无边 | |
comander | |
hayrant | |
connections | |
官场现行记 | |
power lever | |
Aircraft Electrical Circuits | |
Deferred Defect condition | |
mixed-flow nacelle | |
pro parts | |
harness clip | |
harness clipping | |
electrical harness | |
bonging | |
superseded | |
damp climate | |
Z/C | |
前客舱门 | |
Z/P | |
实际油量 | |
Magetic Handing | |
trim line | |
contitive | |
tentitive | |
tentive | |
contentive | |
TAKEOVER & PRIORITY | |
4029KS | |
SOL-HP | |
SOL-HP BLEED VALVE CLOSURE CONTROL | |
certified airframe | |
tube assembly | |
PROGRESSIVE CARE PROGRAM | |
bodyly | |
bodylly | |
concretly | |
capmas | |
capurs | |
capus | |
工作在高速位 | |
PIN-ALIGNMENT | |
Most Zero Wing Fuel Weight | |
Global Capability Reporting | |
Subnetwork Version Number | |
Static grounding | |
positive flight path | |
MZWFW | |
maxium zero wing fuel weight | |
Clevis face | |
Event Initiation | |
TAC SWITCH | |
Header Assignments | |
full scale level test | |
国防动员办公室 | |
angular tolerances | |
design rational | |
thrust face surface | |
Link Frame Cancellation | |
Cancellation Timer | |
Link Frame Cancellation Timer | |
contours | |
surface contours | |
中线灯 | |
Frame Cancellation | |
CT Threshold | |
electrical routing | |
automated flight following | |
degraded sealing | |
磁放心 | |
Directing SLM Frames | |
automatic flight following | |
in any case of | |
hydraulic line routing | |
genuine part | |
lense | |
EVEPURE | |
toe line | |
Single Segment SLM Frame | |
missed equipage | |
电子设备舱 | |
STAT INV | |
主电子设备 | |
Uplink Frames | |
Trim Actuator pin/bearing | |
Frame Processing | |
everpure | |
multiscan | |
idle cont | |
Priority Indexing | |
interchangebale | |
flow return | |
fus integration | |
posts | |
rib posts | |
SWPM | |
Services Architecture | |
Specific Services Architecture | |
SPECIFIC SERVICES ENTITY | |
scratche | |
filtered and smoothed parameter. | |
GE Inspection & Control Technologies (Shanghai) Co., Ltd.Terms and Conditions for Sales and Lease/Rent of | |
dry bay | |
List of Goods and Delivery Schedule | |
英尺高度 | |
30英尺高度 | |
surge tank vent | |
vertical attitude | |
had to | |
TAFFORS | |
Digital Mock Up | |
barometric instrument inertia | |
Contact Cavity Size | |
oleo inner | |
Interial Vertical Velocity | |
profiles | |
SCOTT bright | |
白洁布 | |
MSRS | |
sore point | |
公共航空旅客运输 | |
中国民用航空安全员管理规定 | |
corresponding bit | |
encoding accuracy | |
必换 | |
停场守护 | |
民用航空器停场守护管理规定 | |
diego | |
ERRONEOUS RA HEIGHT INDICATION | |
哪一款 | |
coverdd | |
第一款 | |
single curvature | |
single curvature metal | |
left wing down | |
安全检查规则 | |
中国民用航空安全检查规则 | |
按EO要求对B-xxxx进行机上升级 | |
事故标准 | |
顿体 | |
征候标准 | |
stressed skin | |
事故征候标准 | |
Change Quanta | |
民用航空器事故 | |
are lined with | |
located directly beyond | |
entere | |
managed | |
improve aircraft safety | |
improving aircraft safety | |
diffuser outlet | |
Sidewall diffuser outlet | |
partial is not allowed | |
Ship Method | |
Delivery Schedule: Commencing effective date of the Contract, within the contract term agreed in Annex 1 | |
rotation point | |
massive field | |
tive | |
detecte | |
Skew Mechanism | |
Flight Quotation | |
前起落架右轮 | |
plenun | |
ebsco | |
airborne implementation | |
horizon他了 | |
SWITCHE | |
snaps | |
STUCK IN | |
fmg | |
wing sweep | |
naco | |
smaller | |
保洁队 | |
static source | |
weaco | |
重着陆工卡 | |
理论课程教员 | |
机务 | |
机务教员 | |
route fly | |
instructional enroute | |
机场客梯车 | |
本地带飞 | |
人工操纵着陆 | |
idssoved | |
issoved | |
fepsil | |
全重着陆 | |
flexed | |
tersil | |
Documentation Data | |
Inmarsat Satellite Link | |
airborone | |
Cabin Packet Function | |
Dialogue Service Interface | |