| 单词(默认显示当天的) | 采取的措施 |
| featigue | |
| The time away from base | |
| specified station | |
| sitime | |
| sittime | |
| partitions | |
| 抖振余度 | |
| multi-commodity flow model | |
| ??? | |
| UNTILIZATION | |
| DIRECRLY | |
| dialod | |
| PERFOMED | |
| allocated | |
| IEAS | |
| Air Tran Airways | |
| ??? | |
| EQUALIZATION ORIFICE | |
| origin station | |
| cable circuits | |
| the outboard rear spar | |
| line contractor | |
| generator line contractor | |
| 告别过去,迎接新的一年,一切都会好起来的 | |
| CONTINUITY ( | |
| 一切都会好起来 | |
| Boeing warranty remedies | |
| GPWS system switch | |
| spoilers | |
| 苏宁 | |
| when the reserve | |
| the reserve | |
| score type | |
| ROTARY FLEXSHAFTS | |
| broken strand | |
| broken strands | |
| The primary flight control system has a trim operation on all axes. Only the pitch control has the tabs. | |
| vertical axes | |
| vertical axes. | |
| operates mechanically | |
| ?? | |
| ??? | |
| ??? | |
| ?±???? | |
| Elevator Feel light illuminates | |
| ARTIFICIAL FEEL SYSTEMS | |
| audio communications | |
| Audio-Video Monitoring and Intercommunication | |
| ?? | |