单词(默认显示当天的) | 采取的措施 |
featigue | |
The time away from base | |
specified station | |
sitime | |
sittime | |
partitions | |
抖振余度 | |
multi-commodity flow model | |
??? | |
UNTILIZATION | |
DIRECRLY | |
dialod | |
PERFOMED | |
allocated | |
IEAS | |
Air Tran Airways | |
??? | |
EQUALIZATION ORIFICE | |
origin station | |
cable circuits | |
the outboard rear spar | |
line contractor | |
generator line contractor | |
告别过去,迎接新的一年,一切都会好起来的 | |
CONTINUITY ( | |
一切都会好起来 | |
Boeing warranty remedies | |
GPWS system switch | |
spoilers | |
苏宁 | |
when the reserve | |
the reserve | |
score type | |
ROTARY FLEXSHAFTS | |
broken strand | |
broken strands | |
The primary flight control system has a trim operation on all axes. Only the pitch control has the tabs. | |
vertical axes | |
vertical axes. | |
operates mechanically | |
?? | |
??? | |
??? | |
?±???? | |
Elevator Feel light illuminates | |
ARTIFICIAL FEEL SYSTEMS | |
audio communications | |
Audio-Video Monitoring and Intercommunication | |
?? | |