| 单词(默认显示当天的) | 采取的措施 |
| smoke hood | |
| ?????? | |
| bun r | |
| pounds inches | |
| ??? | |
| Demandmask | |
| Demand mask | |
| w avg | |
| ??? | |
| 试车测试 | |
| ice build up | |
| limiting parameter | |
| limiting paramter | |
| icing severity | |
| wing outbd | |
| tourque equivalent | |
| pounds inch | |
| STARTOK | |
| surface snow fall | |
| synoptic scenarios | |
| 勇敢迈出一大步 | |
| 道面系统 | |
| 符合适航标准 | |
| Cloudtops | |
| 维护频率高 | |
| ??? | |
| Difuser Housing | |
| 基层脱空 | |
| PDASecondary Power Distribution Assembly | |
| IESSiy | |
| RECOMMENDED CHARGE RANGE | |
| 断板 | |
| 航后标准 | |
| 唧泥 | |
| diagnose snow | |
| ball center | |
| ball cebtered | |
| Diagnosis Imagery | |
| Diagnosis Using Appropriate Imagery | |
| 封层养护 | |
| out approach | |
| 沥青道面病害 | |
| 沥青道面 | |
| detrimetal | |
| in the circuit | |
| particular engine | |
| 道面抢修 | |
| runs | |
| gravitational moments | |
| GaAsFET | |
| spoilers | |
| inner and outer barrels | |
| braking action | |
| aysm | |
| elev aysm | |
| eleven aysm | |
| intake grilles | |
| invariably overshoot | |
| antennas | |
| Nacelles | |
| wheel wells | |
| engine nacelles | |
| deflected | |
| NITROGENAND | |
| 符合140部要求的试车位 | |
| 140部 | |
| whilst stationary | |
| 基准失速速度 | |
| open wheel wells | |
| zero workpiece | |
| 试车位 | |
| devs | |
| VACUUM CLEANER. | |
| air extraction filter | |
| very thin wing | |
| 我很幸福 | |
| actual column position | |
| 涡轮风扇恒温器 | |
| Inv. | |
| ??????? | |
| fire signal engine | |
| fire signal eng | |
| electrics variable | |
| electrics] | |
| lock-washer | |
| curve | |
| curve | |
| forward locomotion | |
| 三和日盛 | |
| format\ | |
| 警告店门 | |
| equip for success | |
| set the tone | |
| 昌北 | |
| in the following chapter we will present the conception required to understand the performance of transportation aircrafts | |
| decial | |
| 起落架 | |
| 起落架 | |
| 程序进近 | |
| 程序仅仅 | |
| in the following chapter | |
| varies | |
| jocky | |
| instant situational awareness | |
| HUMIDIFIER PAD | |
| turn follow | |
| turn follow drift | |
| turfol | |
| Gauge - Protrusion | |
| airfoils | |
| blocker door | |
| NGJ | |
| scrap threshold | |
| represention | |
| 总图专业 | |
| ATA100 | |
| material flip-flop | |
| supplied | |
| norminal runway length | |
| breakfast time | |
| endwall liner | |
| 软警告 | |
| 硬警告 | |
| router bit | |
| HEPA-APS | |
| router guide | |
| ECAM UPPER CRT | |
| ?????? | |
| rub block | |
| M&A | |
| vaccume | |
| Sunvisors | |
| Mmo/Vmo | |
| Wing box | |
| ultrallong | |
| ????? | |
| ????? | |
| ????? | |
| Pressurization seals | |
| PLATE | |
| PLATE | |
| liner joiners | |
| avionics bay | |
| Sceet | |
| Elevator hinge | |
| Frustration-Free | |
| 工代会 | |
| stops | |
| slots | |
| instrument transfer | |
| instrument transfer option | |
| engage criteria | |
| go arond | |
| verf | |
| actuator beam | |
| steering metering valve | |
| lock link | |
| AFTER THE DEACTIVATION OF THE APPLICABLE VALVE | |
| soft reversion | |
| soft revert | |
| electric moder | |
| ?油?行 | |
| 背油 | |
| interface load | |
| CAP- BLANKe | |
| ???????? | |
| COMPANY CALL | |
| Boeing Process Specification | |
| 副班 | |
| 副办 | |
| notams | |
| engage、 | |
| EBDI | |
| bifurcation bumpers | |
| jumper rig | |
| Juniper rig | |
| xiananshan | |
| CAP- BLANKING | |
| CABLE HOLDING STRAP | |
| FLUSH IT AWAY | |
| grey color | |
| reamed. | |
| HFRS | |
| build shop | |
| ADSB-IN | |
| FFDPS | |
| protection circuits | |
| plane occupancy | |
| flight occupancy | |
| high occupancy | |
| ?????? | |
| ?????? | |
| ?????? | |
| procedures | |
| ??? | |
| ?????? | |
| ?????? | |
| ??????? | |
| ??? | |
| ma | |
| push rod point | |
| TRUNNION FAIRING | |
| cable spans | |
| ?? | |
| high-altitude | |