| 单词(默认显示当天的) | 采取的措施 |
| ILLUSTRATED | |
| SIZE ENGINE | |
| reoptmization | |
| ????? | |
| ???? | |
| ANGULAR APPROACHES | |
| essi | |
| ecast | |
| aircraft drag polar | |
| Basic Kit | |
| atm30 | |
| PC1 | |
| 1PC1 | |
| Structural limitations | |
| No nose gear adherence effect | |
| uglity | |
| ??????? | |
| ??? | |
| manual drive cover | |
| 截止??期 | |
| ???? | |
| elevator efficiency | |
| Ability to rotate | |
| Beechcraft Queen Air | |
| ??行MU5967航班前???成 | |
| AS SPECIFIED IN SPECIFICATION | |
| 航前发现二???主轮磨损到标。 | |
| Handling quality limits | |
| floor protection | |
| 1° | |
| 1° per g | |
| blundering aircraft | |
| rev f | |
| intervition | |
| extreme load factor | |
| ? | |
| Sea Level Flat Rating | |
| Navigation Buffer | |
| Correction Zone | |
| Correction Zone: | |
| Detection Zone | |
| Normal Operating Zone | |
| 同步漂移 | |
| 同步漂移 | |
| surrund | |
| do | |
| DO CG | |
| 奠定基础 | |
| bonding meter | |
| 初具成效 | |
| 出具成效 | |
| tunnel in the sky | |
| bondingmeter | |
| vious | |
| 6?? LRU | |
| 新农村建设 | |
| tunnel-in-the-sky | |
| nomarlization | |
| tight track | |
| ????? | |
| 管理民主 | |
| Best Takeoff performances | |
| 乡风文明 | |
| ????? | |
| ????? | |
| 十六届五中全会 | |
| ??????? | |
| high+ground | |
| half+jaws | |
| FACK | |
| Depending on A/C DOCG | |
| the blow | |
| Hirth couplings | |
| 执行MU5967航班前完成 | |
| ???????? | |
| 航前发现二号主轮磨损到标。 | |
| 航前发现二???主轮磨损到标 | |
| ???????? | |
| ???????? | |
| ???????? | |
| discret | |
| 航前发现二号主轮磨损到标 | |
| ??? | |
| This job is under general direction, independently to provide maintenance support and customer request analysis and liaison with US/China team to delivery services to the internal and external customer. | |
| support in place | |
| Reference Chord (RC) or Mean Aerodynamic Chord (MAC) | |
| titin | |
| screw onto | |
| ???迫 | |
| 1 | |
| High ground | |
| actuator bar | |
| adjustment endpiece | |
| 英语、汉语单词进行查询 | |
| ??? | |
| Part?time | |
| Part?time | |
| Part?time | |
| compressor discharge | |
| bearning | |
| ??? | |
| identifying authority | |
| fitting nose piece | |
| fitting nose | |
| rear bulb | |
| accurate up | |
| annunus | |
| wear computing energy consumption | |
| operations office | |
| swab etched | |
| swab etch | |
| storing force | |
| Nominal inertias | |
| curviccoupling | |
| manifold port | |
| flight plan data | |
| Lead crack | |
| sponser | |
| Station sensed | |
| Over Station sensed | |
| swichover | |
| installay | |
| cap elbow | |
| elevator Q feel press | |
| APPROACH CLEARAND | |
| stab frl | |
| gain scheduled | |
| double-slotted flaps | |
| skid off | |
| ???? | |
| deposits | |
| cells | |
| ????? | |
| threads | |
| gaurd | |
| cable gaurd | |
| depreserve | |
| beburnt | |
| LuftGerPo | |
| Luftgerateprufordnung\ | |
| Only at time | |
| replacement valve | |
| anti-icing fuel additive | |
| more than | |
| the third crew member | |
| eye-end | |
| Metar mist cloud broken | |
| envelope: | |
| WASTE DRAIN VALVE | |
| 强雨 | |
| error terms | |
| LDEV | |
| re-organization | |
| Paris Charles de Gaulle | |
| Paris Charles | |
| allevait | |
| allevaite | |
| allevaited | |
| smoky start | |
| considation | |
| ENIRY | |
| 仅适用 | |
| scores | |
| Fueling Receptacle | |
| contout | |
| retrict | |
| 入册 | |
| 编入手册 | |
| nosie abatement procedures | |
| procedures | |
| Flattened | |
| 科技成果鉴定 | |
| 报键 | |
| safety interventions | |
| panpan | |
| Million sortie rate | |
| motor converter assembly | |
| 万架次 | |
| 万架次率 | |
| ms9226 | |
| aerodynamic+cord | |
| BULB TYPE MECHANICAL SEALS-REMOVAL/INSTALLATION | |
| on first | |
| preferred to | |
| in progerss | |
| cyliner | |
| interphone purposes | |
| themodynamic | |
| congstion | |
| BULB TYPE MECHANICAL SEALS | |
| Financial SMS | |
| Install The Bolts,Washesr,And Nuts To Attach TheLower Bearing Housing To The Airplane Structure | |
| pushrods-repairs | |
| treatment of fastener and fasteners holes in composites | |
| enthalpic | |
| 协调联动办 | |
| Remove The Nuts | |
| Actuator PUSHRODS | |
| Main Gear Operating Sequence | |
| Mounts | |
| airworthness authority | |
| airworthnessauthority | |
| mist cloud | |
| mist cloud broken | |
| metar warsaw | |
| slug driver | |
| octas | |
| 电信铁塔 | |
| hfce | |
| inaccuray | |
| entropic force | |
| race assembly | |
| negleshion | |
| operations\ | |
| dispersal operations | |
| wet up | |
| 建筑八局 | |
| 中建八局 | |
| 乘汽车去大约要花3小时,也可以乘火车或飞机去 | |
| 每年有大批中外游客前去旅游观光 | |
| glassfiber laminate | |
| Magne Gage | |
| MagneGage | |
| Magne-Gage | |
| CRRM | |
| master MEL | |
| track welding | |
| 黄山位于安徽南部,是中国著名的名胜古迹。 | |
| up-check | |
| up check | |
| acitve | |
| 北道口 | |
| 周围空旷 | |
| 空间大 | |
| RIJHT | |
| engine-out | |
| Arc radian | |
| Engine-out Engaged | |
| riser duct | |
| devider | |
| UALD | |
| FMC IAS discrete | |
| 膜盒膨胀 | |
| pin assembly | |
| static+pressure | |
| IAS discrete | |
| ISA discrete | |
| incrise | |
| aneroid capsules | |
| during flight | |
| mounting screws | |
| the tie bolts removed and the wheel halves dye penetrant inspected. | |
| split-pin | |
| 海平?? | |
| HFWD | |
| viaducts | |
| elevation of pass | |
| D-PDC | |
| coastal gurad | |
| aeril cable | |
| vfr waypoints | |
| ultralight activity | |
| guy wires | |
| fuel adapter | |
| fss outlet | |
| remoted to Navaid | |
| remote to Navaid | |
| vfr advsy | |
| right traffic | |
| Supplier authority | |
| right traffic pattern | |
| right traffic patterns | |
| canadian advisory | |
| daown | |
| ??? | |
| interpretere | |
| Inspect wheel bearings and races for wear, pitting, cracks, discoloration, rust or other indications of damage. | |
| Heater Lever | |
| What is the Harmassumed of compartment 4 | |
| Bowdencable | |
| ptfe-finish | |
| COALESERBAG | |
| rotating bacon | |
| CARGODR | |
| DRIVENOSECARGODR | |
| untralight | |
| untralight flight park | |
| untralight glight partk | |
| yellow band | |
| overcast below | |
| other than hard surfaced | |
| landmark value | |
| 车辆通行 | |
| hard surfaced runways | |
| communication box | |
| short circuit risk | |
| SEAL RUBBER RING | |
| thread relief | |
| OO-SLT | |
| 有人提出建议 | |
| Oversize dimension | |
| 给带来 | |
| LAYER MAP | |
| DOHarm | |
| RETS | |
| RC length | |
| Href | |
| DOCG | |
| make-up area | |
| penetrating spray | |
| keeper pins | |
| Simple action | |
| pitten | |
| per \ | |
| per inner | |
| per inner tank | |
| Defective bellows | |
| ??? | |
| aerodynamic cord | |
| enovia | |
| User Applications | |
| Hellenik on | |
| Helleni kon | |
| CAD NOTE | |
| Bleed Control Valve | |
| Flow body assembly | |
| tabulated charts | |
| spin-mould | |
| Graphical scales | |
| SHEET DESIGN | |
| IN-FLIGHT MOVEMENTS | |
| EXPIRED | |
| 121.5 | |
| scrvice | |
| 125.1 | |
| filter head | |
| expird | |
| PLGA | |
| extended over water | |
| PAX INACCURACY | |
| full authority | |
| SB configuration | |
| SNUBBING ACTION | |
| split ball | |
| split ball assembly | |
| Authority dataset | |
| operational inaccuracies | |
| dow definition | |
| upperstage | |
| lubration | |
| Related Investigative | |
| Repetitive Measurements | |
| TRACK II | |
| ARINC 661 | |
| Widgets | |
| 赶快加入我们吧 | |
| unserviceablility | |
| 不要犹豫 | |
| intergrate | |
| instructon | |
| piten | |
| 魔术社 | |
| pital | |
| registration movement | |
| medium to poor | |
| drive couplings | |
| toothing drive | |
| fast-follower | |
| implemente | |
| lateral dihedral | |
| nonturine | |
| disengage autopilot | |
| PLATE | |
| PLATE | |
| machenical | |
| gear-walk | |
| sound swallowing | |
| BETRIE | |
| sound swallowing cushion | |
| reflection of sound | |
| turn lines | |
| turn line | |
| lean in | |
| shaft mounted | |
| 360°configuration | |
| fincal | |
| 地面训练 | |
| ??????????? | |
| obserbe | |
| sylmar | |
| specifice | |
| specifice requirement | |
| institute root cause investigation | |
| a full power test run | |
| no tension | |
| SHRA | |
| Distance to Waypoint | |
| ground operation | |
| integration potencial | |
| one-way forward | |
| 过站 | |
| ram,p | |
| igmguid | |
| ascent guidance | |
| ???务???? | |
| display emulation | |
| ???????? | |
| 垂尾冰 | |
| FUEL MILEAGE PENALTY | |
| ??????????? | |
| ??常管理 | |
| 工作???制 | |
| terminal | |
| hing | |
| ??入定检 | |
| inlet cowl | |
| flight cycle | |
| ???? | |
| ???动 | |
| ???? | |
| ???纸 | |
| 整流?? | |
| ??航??令 | |
| 飞行???组 | |
| ???质 | |
| ??免 | |
| probes | |
| 已经??知 | |
| ??开 | |
| 不够??? | |
| ??开 | |
| btie | |
| Alternative Procedures | |
| mileage-based | |
| ????? | |
| controll | |
| ??????地??? | |
| 机务 | |
| bays | |
| 高于地面 | |
| BATTERY AND CHARGER | |