circlr the aerodrome
wrentch
sweeping rate
laminate Tape
Mylar laminate Tape
thermal nitric oxide
de-coupling
test connection plug
rotable handling
.
misses
de-ice supply line
Mild soapy water
rul/typ
aerordrome
preceding point
takeoffing
introduced directly
CDFIU
keel access
gauge extension
incorperated
incooperated
Ammunition bay
FOIL-FRONT
the social culture system
Aft tailboom
IN AIR CONDITION
Belly antenna
predictability indicators
predictability indicator
Survival kit bay
Active Vibration Control
FG HEALTHY
TOTAL ANTI ICE ON
TOTAL ANTI
Igniter arm
aft detent
tube aft detent
gear rib area
功放室
air sensor
total air sensor
tube interior
Load Access
Load Access Panel
Stabilator Units
drgradation
undercarriage reinforcing
Heatign Blanket
Ethernet Switching
Ethernet Switching Hub
cup set
catering delay
FLEXBAND
material logistic三
material logistic
ACCOMPOLISHED
使。。。化
NTO thrust
galvanically
clear cie
Practice\
stratifie
perform maneuver
duct temperature
devergent
airbrage
head trauma
jet-lag
weather fronts
mountain waves
paking breake
jet scream
coures Sensitivity
southly
The air conditioning system utilizes two identical air cooling packs, right
methyl n-propyl ketone
the airframe-engine combination.
穿墙板
单项电源
spoke fairing
兴平shijue.me/search/content?q/
AC Essential Bus
Assemble structure
assembly structure
拼装结构
secal check
抗震裂
抗震裂度
地面代理服务
航空地面代理服务
航空地面代理
民用航空地面代理
Ejector Flow
decent ride
NVM (Non-Volatile Memory)
descent ride
harness cannon
harness cannon plug
attach lug
Two control columns provide pitch control of the airplane.
elevators Two control columns provide pitch control of the airplane.
AMS CTRL In/Out
a line of weather
SPDA 2 (SLOT)
90 - MINUTE OPERATION
90 - MINUTE OPERATION 、
Forward gravity fuel cap
initiat
bracke
nvelty
flamesout
Personnel Authorisation
astronomical observations
astronomical observationss
High ground
角型件
角形件
fire pull
thiottle
with to
ice pellet
The gate number for flight MU88 has changed from 16 to 18
give me a good rate down
good rate
extended range fleet
engine removal rate
manveurer
fudimu
机身结合部
FUEL BLEE
GEAR FUEL BLEE
MOTOR GEAR FUEL BLEE
flight principle
transiton process
impliy
Cabin Definition
zssessment
preventivly
RELIABILITY PROGRAMME
blade airfoil surfaces
compressor turbine blade airfoil surfaces
can be made
Time enroute
ground guide
vscv
雪糕桶
pod engine
FCMM
intercept fix
intercept fix,
deformation, displacement
cabin ventilation system
departure information
flower fen
four cs
altitude bust
启动电力组件
启动转换组件
revision control
revision control.
twa ngped
aring bus
conservative first check
stati ground
intentionallyleft
mutual traffic
is an electro?pneumatic operated valve.
trbleshooting
plexer
sumcheck
suncheck
oncoming traffic
power up ram test
Glipe Slope
degradasion
airframe-engine
fixe
signficance
enpgaged
signficiance
grease covers
CFTT
falshing
istallation
EDP Case
Circling Approach
pressured air
Precision Approach Cat
modest track
Planning Minima
pressured
标靶
landing minima
circling manoeuvre
Removalr
Airfield Ceiling
PRM XL
ancillary catch tube
NOSE LANDING GEAR DOWN
裁减客
裁减客人
NOSE LANDING GEAR (NLG) DOWN
减人
ground-looping
Q/I
course ibdicator
pneumatic leak test
solar screen
dcelerate
rconfiguration
dominate wind
FOVE
seeker field
radial blocker
rotor transmissions
feel feed
sustained-altitude
trasducer
centerline structure
Volumetric Hydraulic Fuse
吊舱盖板
spill door
logical acknowledgement
logical acknowledgement prohibited
derester
derestor
electrical harness
zsjh
ctrline
cockput
below the standard
ESED
乌塔堡
Turbulence chart
saglek
FLEX TRACKS
AUSOTS
CONGESTION,
roger that
nut-slflkg
撑杆组件
engine decrease
block.
lifeport
Loading Utility System
Patient Loading
dreem
欢迎光临 航空论坛_航空翻译_民航英语翻译_飞行翻译 (http://bbs.aero.cn/) | Powered by Discuz! X2 |