航空论坛_航空翻译_民航英语翻译_飞行翻译

 找回密码
 注册
搜索
查看: 883|回复: 0
打印 上一主题 下一主题

蓝天民航词典2010年5月6日未查出输入评析 [复制链接]

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
1#
发表于 2010-5-7 09:09:35 |只看该作者 |倒序浏览
单词(默认显示当天的) 采取的措施
comprising  
depature  
tailwinds  
resulting system  
dive speed  
design dive speed  
/ramp  
landing flap setting  
滑包  
multiple aeroplane systems  
rnave  
heading change,  
Indications  
cquation  
Offset Holes  
extra scrutiny  
low-aspect-ratio  
provids  
proposed system  
proposed system(  
winglets  
evaluations  
Paragraphs  
tvb  
normal generator line contactor  
certification credit  
specific evaluation  
simulators.  
mock-ups  
normal failure  
wireless binary  
adpator  
airborne portion  
original failure  
leading to  
Pneumatic or Hydraulic  
Pneumatic or Hydraulic Motor Drive Power Source  
Bi-direction  
full T/O  
Human performance issues  
keeness  
earth systems  
unsterile  
feederelectrical cable  
No hazard should result from the effects of variations in ambient temperatures on either the protective  
severe wind and moisture problem  
IDENTIFICATION OF CANDIDATE  
failures  
rare normal  
rare-normal  
rare-namal  
cockpit view  
v1.9  
wet runway surface field length  
flightgear  
flight gear  
Flight Dynamics Visualization  
APU starting  
APU startingstarting  
out-of-trim  
bundle size derating  
significiant  
ice-protection  
initial rotation  
matrix of MoC  
contaminat  
uncontaminat  
uncontaminate  
ucontaminate  
System behaviour  
List of  
监视 学生 机长  
监视 学生机长  
监视学生机长  
Student Pilot in Command  
aditional  
degrees  
degrees of  
degrees of novelty  
naturally occurring  
tasks  
crew tasks  
flight crew error  
Mode Selector Panel  
cvcv  
islotach  
wire-to-wire  
wiretowire  
Deicy  
wings level  
wing level  
minimise fatigue breakage  
pronostic  
diversion profile  
进一步指令  
岔路口  
carbonizes  
thrust setting  
rubber-beaded  
R.Whitcomb  
conductive carbon  
conductive carbon path  
engaged state  
intercept、  
proximity the ground  
split-axes  
split axes  
operational need  
endplated  
Door-mounted  
aeroplane response  
levelling manoeuvre  
kongtiao  
well phase  
the well phase  
applicants  
confidengce  
performance information  
outbound bearing  
right crosswind  
a right crosswind  
pitch and roll  
pitch and roll axe  
pitch and roll axes  
pilot action  
TO the station  
reference airspeed  
annunciated  
gaidepath  
Specific Condition  
glidepath angle  
obstacle plane  
smitch  
smitchaero  
deviation profile method  
deviation profile  
偏移剖面  
pilot selection  
altitude overshoot  
load sheet  
pack components  
program switch module  
program switch modules  
flow up  
static wick  
st. elmo  
erractically  
avionics ventilation  
lithium manganese dioxide  
lithium manganese dioxide cells  
master dim and test  
master dim  
ppiu  
TO/FROM  
TO/FROM indicator  
outbond  
rochester  
dipelxer  
VOR test signal  
omnireceiver check  
aerodynamic smoother  
满足航天使用  
ewis  
配载舱  
high minimum  
eastern daylight time zone  
central daylight time zone  
座充  
座舱失压  
categorie  
航行情报资料  
备降用英语怎么说  
装载配平  
装载配平单  
identification plug  
等待速度  
High minimums  
边缘天气  
最低起飞标准  
MULTISECOND  
运行熟悉  
资格检查  
文具袋  
航路备降场  
新机长  
延伸航程运行  
STC applicant  
延伸跨水运行  
over fly  
运行限制  
supplemental type certificate  
危险天气  
axepol  
aeroxpl  
机场分析  
运行规范  
签派放行  
cutour  
traffic pattern departure procedure  
active runway  
转向飞行  
sworing  
sworing maneuver  
mark beacon  
umregulate  
impending bypass  
air driven starter  
set knob  
manual set  
您需要登录后才可以回帖 登录 | 注册


Archiver|航空论坛 ( 渝ICP备10008336号 )

GMT+8, 2024-11-27 16:54 , Processed in 0.028002 second(s), 10 queries .

Powered by Discuz! X2

© 2001-2011 MinHang.CC.

回顶部