| 单词(默认显示当天的) | 采取的措施 |
| ????? | |
| stab command | |
| descend via | |
| roll command | |
| PITCH COMMAND | |
| lateral routing | |
| 本场 | |
| ove ride | |
| ????? | |
| engine start enrichment | |
| adverse starting | |
| elatc | |
| un-corr | |
| power allowable | |
| ??? | |
| ?? | |
| an Airbus A320 was cleared for takeoff from runway 03R | |
| reference wing area | |
| the Inter Turbine Temperature | |
| soft jawed pliers | |
| joint effort | |
| performing flight NT-463 | |
| flight NT-463 | |
| 固定的航班 | |
| The CIAIAC analysed that the engine manufacturer knows about a typical buildup of carbon accumulation in the #2 bearing oil injector as particles accumulate | |
| the right hand engine | |
| dry microburst | |
| nominal hole | |
| virtual cockpit | |
| Operational Concept Document | |
| ENG/MASTER | |
| multiple microburst | |
| unlimited single station | |
| delicered | |
| caelib | |
| runtime license | |
| shanll | |
| the approach | |
| simfinity | |
| pulled off the approach | |
| tower cleared an Airbus A320 lined up at runway 03R for takeoff | |
| 中国航空信息系统 | |
| 中航信系统 | |
| cleared the Boeing to land | |
| be cleared to | |
| load share switch | |
| an Airbus A320 was cleared to take off from runway 03R | |
| non-latching | |
| signal conditioning interface | |
| inadvertent overspeed | |
| CONTROL COLUMN POSITION | |
| trudea | |
| serial communication interface | |
| radio stn | |
| governor cam | |
| low pump | |
| low fuel pump | |
| electro-hydromechanical | |
| electro-hydromechanica | |
| vtss | |
| master geometry | |
| human in the loop | |
| 紧急油量 | |
| off-chart | |
| routing envelope | |
| RF SENS | |
| captain’s | |
| Managed Speed Control | |
| do | |
| procurable part | |
| mounting rails | |
| facitility | |
| 经济管理专业 | |
| bunmper | |
| grill and housing | |
| Geometric definition | |
| computational modelling | |
| 航空飞行专业 | |
| 本场教员 | |
| 本场飞行教员 | |
| elevator tabs | |
| FINGER SCREEN | |
| PORT FINGER | |
| flareless tube sleeves | |
| apgr | |
| flush latch | |
| flush latches | |
| habitual base | |
| H/T | |
| aircraft readiness | |
| burnt cert | |
| Abradable | |
| 流控 | |
| fixe | |
| elastomer corner | |
| rod end | |
| three-foot | |
| three-foot cable | |
| contain courses | |
| 空烧 | |
| 控制区通行证 | |
| come first. | |
| electriv | |
| comes first. | |
| Whichever comes first. | |
| seatings | |
| PLANRAMP | |
| age-realted | |
| FINRES | |
| usage dependant | |
| cost-effectively | |
| zonal boundary | |
| zonal boundaries | |
| integrity necessary | |
| structural integrity necessary | |
| ?? | |
| 速派 | |
| Structure airworthiness | |
| regulatory loads | |
| 派遣人员 | |
| 液压故障 | |
| 电路故障 | |
| electro tape | |
| concentrater | |
| fuel conveyance | |
| dimming control | |
| dimming control system | |
| ?? | |
| stowage clip | |
| MCKINLAY | |
| backshell+ | |
| tape transparent | |
| electro tape transparent | |
| 搜油泵 | |
| Data-link Control and Display Units | |
| packing reformed | |
| pu-erosion protection | |
| safe separation | |
| aileron bus | |
| DRAINMAST HEATER | |
| aileron bus force limiter | |
| ? flaked | |
| shop visit | |
| MTBSV | |
| drain mast | |
| number and names | |
| closed latch | |
| deflection track | |
| DATALINK | |
| 定检 | |
| downlink message | |
| Tonne-Kms | |
| 航空器航线维修 | |
| 请浦东基地定检部派出电子检验人员协助虹桥基地完成A检检验工作。 | |
| upper latch hook | |
| 应急卸压 | |
| 引气口 | |
| 主送风管 | |
| 混合腔格栅 | |
| 结冰探测器装机 | |
| 短舱防冰系统 | |
| 竖直停放 | |
| 曲面风挡雨刷系统 | |
| 良蒂不秀 | |
| MTTFSV | |
| Jeppesen | |
| Air Charter | |
| distract the slats | |
| distraction of slats | |
| exped | |
| extractor bolts | |
| Baggage Door Annunciator Circuit ? | |
| Baggage Door Annunciator Circuit ? | |
| airworthiness directives | |
| ???? | |
| tow bay | |
| ??? | |
| ?????? | |
| ???????? | |
| ??????? | |
| ??????? | |
| ?м?? | |
| ???????? | |
| ????? | |
| nuisance alerts | |