单词(默认显示当天的) |
采取的措施 |
aerodromes |
|
spacecraft bus |
|
fuzzy logic decision |
|
contains |
|
sustained winds |
|
sustainde |
|
upgraded |
|
rule-based |
|
rule-base |
|
model-based |
|
boardary |
|
moved |
|
moved over |
|
sealde |
|
slope fog |
|
accros |
|
accross |
|
appropri |
|
deems |
|
arrival at |
|
initiated up |
|
portboard |
|
describle |
|
frightene |
|
reger |
|
regerd |
|
庞巴迪 |
|
ues |
|
uses |
|
ingcreases |
|
asturated |
|
dissiption |
|
breeze front |
|
preater turbulence |
|
preater |
|
gust front |
|
defintion |
|
centerline of |
|
closest to |
|
temperatures |
|
effects of |
|
stepper-motor |
|
proscrib |
|
proscri |
|
proscribed |
|
an inversion |
|
propeller thrust only |
|
a measure of |
|
a measure sf |
|
higher angle |
|
critical for |
|
cossi |
|
manual test |
|
mober |
|
passanger |
|
passager |
|
reversor |
|
static source |
|
SB/SL |
|
isschedul |
|
isscheduled |
|
real time analysis |
|
bolt erosion |
|
stationary seal |
|
grade of fuel |
|
discharges |
|
replenishe |
|
replenished |
|
sediments |
|
sensing unti |
|
overflow draim |
|
apologies |
|
malfunctions |
|
sourse |
|
estimating further clearance |
|
imjuryin |
|
imjury |
|
potemtial |
|
MCO’S |
|
MCOS |
|
pretake |
|
pretakeoff |
|
siren tug |
|
prevent cavitation |
|
capable of |
|
poston |
|
minnister |
|
virgna |
|
as soon as practibly |
|
as soon aspractibly |
|
practibly |
|
as soon as practically |
|
pratiablely |
|
gym suction |
|
开打 |
|
gleim |
|
签注 |
|
登飞机 |
|
enburk |
|
enbark |
|
keep well to left |
|
mike blocked |
|
pass your message |
|
hectopascals |
|
Trailor |
|
cooling hole |
|
tracks beam |
|
acoustic barrel |
|
comprising |
|
depature |
|
tailwinds |
|
resulting system |
|
dive speed |
|
design dive speed |
|
/ramp |
|
landing flap setting |
|
滑包 |
|
multiple aeroplane systems |
|
rnave |
|
heading change, |
|
Indications |
|
cquation |
|
Offset Holes |
|
extra scrutiny |
|
low-aspect-ratio |
|
provids |
|
proposed system |
|
proposed system( |
|
winglets |
|
evaluations |
|
Paragraphs |
|
tvb |
|
normal generator line contactor |
|
certification credit |
|
specific evaluation |
|
simulators. |
|
mock-ups |
|
normal failure |
|
wireless binary |
|
adpator |
|
airborne portion |
|
original failure |
|
leading to |
|
Pneumatic or Hydraulic |
|
Pneumatic or Hydraulic Motor Drive Power Source |
|
Bi-direction |
|
full T/O |
|
Human performance issues |
|
keeness |
|
earth systems |
|
unsterile |
|
feederelectrical cable |
|
No hazard should result from the effects of variations in ambient temperatures on either the protective |
|
severe wind and moisture problem |
|
IDENTIFICATION OF CANDIDATE |
|
failures |
|
rare normal |
|
rare-normal |
|
rare-namal |
|
cockpit view |
|
v1.9 |
|
wet runway surface field length |
|
flightgear |
|
flight gear |
|
Flight Dynamics Visualization |
|
APU starting |
|
APU startingstarting |
|
out-of-trim |
|
bundle size derating |
|
significiant |
|
ice-protection |
|
initial rotation |
|
matrix of MoC |
|
contaminat |
|
uncontaminat |
|
uncontaminate |
|
ucontaminate |
|
System behaviour |
|
List of |
|
监视 学生 机长 |
|
监视 学生机长 |
|
监视学生机长 |
|
Student Pilot in Command |
|
aditional |
|
degrees |
|
degrees of |
|
degrees of novelty |
|
naturally occurring |
|
tasks |
|
crew tasks |
|
flight crew error |
|
Mode Selector Panel |
|
cvcv |
|
islotach |
|
wire-to-wire |
|
wiretowire |
|
Deicy |
|
wings level |
|
wing level |
|
pronostic |
|
diversion profile |
|
进一步指令 |
|
岔路口 |
|
carbonizes |
|
thrust setting |
|
rubber-beaded |
|
R.Whitcomb |
|
conductive carbon |
|
conductive carbon path |
|
engaged state |
|
intercept、 |
|
proximity the ground |
|
split-axes |
|
split axes |
|
operational need |
|
endplated |
|
Door-mounted |
|
aeroplane response |
|
levelling manoeuvre |
|
kongtiao |
|
well phase |
|
the well phase |
|
applicants |
|
confidengce |
|
performance information |
|
outbound bearing |
|
right crosswind |
|
a right crosswind |
|
pitch and roll |
|
pitch and roll axe |
|
pitch and roll axes |
|
pilot action |
|
TO the station |
|
reference airspeed |
|
annunciated |
|
gaidepath |
|
Specific Condition |
|
glidepath angle |
|
obstacle plane |
|
smitch |
|
smitchaero |
|
deviation profile method |
|
deviation profile |
|
偏移剖面 |
|
pilot selection |
|
altitude overshoot |
|
load sheet |
|
pack components |
|
program switch module |
|
program switch modules |
|
flow up |
|
static wick |
|
st. elmo |
|
erractically |
|
avionics ventilation |
|
lithium manganese dioxide |
|
lithium manganese dioxide cells |
|
master dim and test |
|
master dim |
|
ppiu |
|
TO/FROM |
|
TO/FROM indicator |
|
outbond |
|
rochester |
|
dipelxer |
|
VOR test signal |
|
omnireceiver check |
|
aerodynamic smoother |
|
满足航天使用 |
|
ewis |
|
配载舱 |
|
high minimum |
|
eastern daylight time zone |
|
central daylight time zone |
|
座充 |
|
座舱失压 |
|
categorie |
|
航行情报资料 |
|
备降用英语怎么说 |
|
装载配平 |
|
装载配平单 |
|
identification plug |
|
等待速度 |
|
High minimums |
|
边缘天气 |
|
最低起飞标准 |
|
MULTISECOND |
|
运行熟悉 |
|
资格检查 |
|
文具袋 |
|
航路备降场 |
|
新机长 |
|
延伸航程运行 |
|
STC applicant |
|
延伸跨水运行 |
|
over fly |
|
运行限制 |
|
supplemental type certificate |
|
危险天气 |
|
axepol |
|
aeroxpl |
|
机场分析 |
|
运行规范 |
|
签派放行 |
|
cutour |
|
traffic pattern departure procedure |
|
active runway |
|
转向飞行 |
|
sworing |
|
sworing maneuver |
|
mark beacon |
|
umregulate |
|
impending bypass |
|
air driven starter |
|
set knob |
|
manual set |
|