航空论坛_航空翻译_民航英语翻译_飞行翻译

 找回密码
 注册
搜索
查看: 1550|回复: 1
打印 上一主题 下一主题

Outer Wing Main Landing Gear Support Rib 5 Fitting Inspection / Modification [复制链接]

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
1#
发表于 2010-9-17 10:10:26 |只看该作者 |倒序浏览
游客,如果您要查看本帖隐藏内容请回复
附件: 你需要登录才可以下载或查看附件。没有帐号?注册

Rank: 9Rank: 9Rank: 9

2#
发表于 2010-9-17 10:10:38 |只看该作者
1/2
EASA AIRWORTHINESS DIRECTIVE
AD No : 2007-0213
Date: 07 August 2007
No person may operate an aircraft to which an Airworthiness Directive applies, except in accordance with the
requirements of that Airworthiness Directive unless otherwise agreed with the Authority of the State of Registry.
Type Approval Holder’s Name :
AIRBUS
Type/Model designation(s) :
A318, A319, A320 and A321 aircraft
TCDS Number: EASA A.064
Foreign AD: Not applicable.
Supersedure: This AD supersedes EASA AD 2006-0069R1
ATA 57 Wings – Outer Wing Main Landing Gear Support Rib 5 Fitting –
Inspection / Modification
Manufacturer(s): AIRBUS (formerly AIRBUS INDUSTRIE)
Applicability: AIRBUS A318, A319, A320 and A321 aircraft, all certified models, all serial
numbers (MSN) except aircraft that have received AIRBUS modification 32025 in
production or AIRBUS Service Bulletin (SB) A320-57-1118 in service.
The requirements of this AD do not apply to a MLG Support Rib 5 Fitting that
has been repaired i.a.w. A319 Structural Repair Manual (SRM) 57-26-13
paragraph 5.C or i.a.w. A320/A321 SRM 57-26-13 paragraph 5.D.
Reason: Several cases of corrosion of the main landing gear (MLG) rib 5 fitting lug bores
have been reported on A320 family aircraft. In some instances, corrosion pits
caused the cracking of the forward lug (sometimes through its complete
thickness). If not detected, the cracking may lead to the complete failure of the
fitting and thus could affect the structural integrity of the MLG installation.
EASA AD 2006-0069 was issued to address this condition and required repetitive
inspections and corrective action, as necessary.
The present AD supersedes AD 2006-0069R1 and mandates a repetitive
inspection program of the MLG rib 5 fitting forward lugs and requires a
modification that is terminating action for the repetitive inspection requirements of
this directive.
Effective Date: 21 August 2007
2/2
Compliance: 1. Inspections :
1.1 For A318, A319, A320 aircraft, inspect the forward lug of the MLG
support rib 5 fittings as per the SB A320-57-1138 Revision 01:
• within 150 flight cycles following the last inspection as per AD 2006-
0069R1, if visual
or
• within 940 flight cycles following the last inspection as per AD 2006-
0069R1, if by ultrasound
or
• before next flight following a hard landing.
1.2 For A321 aircraft, inspect the forward lug of the MLG support rib 5
fittings as per the SB A320-57-1138 Revision 01:
• within 100 flight cycles following the last inspection as per AD 2006-
0069R1, if visual
or
• within 630 flight cycles following the last inspection as per AD 2006-
0069R1, if by ultrasound
or
• before next flight following a hard landing.
1.3 For all aircraft, repeat the inspection at intervals defined in SB A320-57-
1138 revision 01;
In case of findings, refer to the SB A320-57-1138 Rev 01 for further
instructions.
2. Final fix :
Within five (5) years after the effective date of this directive, modify the MLG
Rib Bushes in accordance with instructions in Airbus SB A320-57-1118
revision 03.
The embodiment of the SB A320-57-1118 constitutes terminating action and
cancels the repetitive inspection requirements of paragraph 1 of this directive.
The repair of a MLG support rib 5 fitting i.a.w. A319 SRM 57-26-13 paragraph
5.C or A320/A321 SRM 57-26-13 paragraph 5.D, as applicable, constitutes
terminating action and cancels the repetitive inspection requirements of
paragraph 1 of this directive for that support fitting.
Ref. Publications: AIRBUS Service Bulletin (SB) A320-57-1118 at original issue; and SB A320-57-
1138 Revision 01; or later approved revisions of these documents.
Remarks : 1. If requested and appropriately substantiated the responsible EASA
manager for the related product has the authority to accept Alternative
Method of Compliance (AMOCs) for this AD.
2. This AD was posted on 14 March 2007 as PAD 07-040 for consultation until
16 April 2007. The Comment Response Document can be found at
http://ad.easa.europa.eu/ .
3. Enquiries regarding this AD should be addressed to the AD Focal Point,
Certification Directorate, EASA. E-mail ADs@easa.europa.eu
4. For any question concerning the technical content of the requirements in
this AD, please contact AIRBUS - Fax 33 5 61 93 44 51.

使用道具 举报

您需要登录后才可以回帖 登录 | 注册


Archiver|航空论坛 ( 渝ICP备10008336号 )

GMT+8, 2024-11-25 16:52 , Processed in 0.024001 second(s), 13 queries .

Powered by Discuz! X2

© 2001-2011 MinHang.CC.

回顶部