- 注册时间
- 2011-11-30
- 最后登录
- 2011-11-30
- 在线时间
- 0 小时
- 阅读权限
- 10
- 积分
- 0
- 帖子
- 2
- 精华
- 0
- UID
- 10954

|
Installation of the wheel
7 c) o. Q7 ?. {
& E4 s! S/ S0 U8 e(a) Clean the inner surface of the wheel bearings (surface that touches the axle). Do not apply grease on these surfaces.
4 N- V) |; o2 [1 {& ~# \% Q1 L/ P7 v* G6 k! T$ N; O f
(b) Install the wheel, with the valve outboard, with a handling tool. ! v. p1 c/ Y7 p$ O& y; L! |
(c) Remove the PROTECTOR NLG (J47548) 9 z/ y0 |* K, T! S* w$ h+ @
% O6 p$ m& M: N
(d) Apply a light coat of Material No. 04-004* (COMMON GREASES) or Material No. 04-022* (COMMON GREASES) or Material No. 04-035* (COMMON GREASES) on the axle. : i+ n" K1 [: P1 }8 m8 l' |
7 |+ V" `% H z5 y( y9 c9 M(e) Install the axle nut (10). ) C+ _, ^; p" J: k, a5 t7 P& ?
% n. }2 F8 `% W* t& p" K(f) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 21.80 m.daN (160.77 lbf.ft) with the ADAPTOR NLG (J47549) . 8 C( I8 ]: j: H1 M$ n6 n
5 \4 t% h* q: X( P(g) Prevent rotation of the wheel and loosen the axle nut (10).
- B' k: }( i7 q m. F( K0 b7 }" \/ o6 D4 e: j5 M7 W
(h) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 10.85 m.daN (80.01 lbf.ft). , y$ J) L, L* x/ F1 X
9 H' ^+ F7 o4 p8 T$ h% ^+ b
(i) Tighten the axle nut (10) until the holes for the bolts (5) are aligned.
5 c6 y$ n: f& D
' Q6 ^0 v) E6 W(j) Turn the wheel and make sure that the wheel is installed correctly.
* p6 w3 p- a9 T4 l4 y1 N+ m, x8 B7 o H4 S. H6 u3 ^' ~0 i- r, d
(k) Install the casing (9).
& V/ B8 m3 W0 T" o! k2 p
6 A( l. x, e) n, M, X(l) Install the bolts (5), the washers (2) and the new IPC-CSN (32-21-13-03-070) nuts (3) .
1 c( {, a4 D/ d! g7 v$ H* y
) j$ `+ E! ~3 \(m) TORQUE the nuts (3) to between 0.4 and 0.45 m.daN (35.40 and 39.82 lbf.in) and safety them with the new IPC-CSN (32-21-13-03-060) cotter pins (4) . ! V& R: ]/ ~4 y2 `
这是前轮安装工卡 请问红色的那句话怎么翻译 谢谢。 |
|