- 注册时间
- 2011-11-30
- 最后登录
- 2011-11-30
- 在线时间
- 0 小时
- 阅读权限
- 10
- 积分
- 0
- 帖子
- 2
- 精华
- 0
- UID
- 10954
|
Installation of the wheel
3 N8 d/ S2 c$ f2 b. F- j* k5 e$ ^7 W0 h: a5 P
(a) Clean the inner surface of the wheel bearings (surface that touches the axle). Do not apply grease on these surfaces.
) u: J3 f4 T5 _+ z" e, x _8 g% t- K; f3 z# g5 S
(b) Install the wheel, with the valve outboard, with a handling tool. : \; b1 ^: j2 C$ ^0 E
(c) Remove the PROTECTOR NLG (J47548)
9 g) m' G0 |) Q' Q
3 Y) B+ j- G5 N3 H1 J3 t# s (d) Apply a light coat of Material No. 04-004* (COMMON GREASES) or Material No. 04-022* (COMMON GREASES) or Material No. 04-035* (COMMON GREASES) on the axle.
: B9 h( f4 q U
2 S5 O" i$ z P3 T' ]# _3 { H(e) Install the axle nut (10).
% l* t( r7 i0 q% s7 E. F+ j6 q6 s0 Z! e# F# O7 q
(f) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 21.80 m.daN (160.77 lbf.ft) with the ADAPTOR NLG (J47549) . # i9 e( ~. f9 h( c2 n. K
! d1 ]3 ]' j( P* b- C, D(g) Prevent rotation of the wheel and loosen the axle nut (10).
/ Y; X) C9 s# S" j
8 Y, m# |4 Z2 e# ^(h) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 10.85 m.daN (80.01 lbf.ft). ! n8 N/ C u: w, o8 W ?! x9 y
+ m$ G* @9 r& e t+ r+ K, I: Y$ }(i) Tighten the axle nut (10) until the holes for the bolts (5) are aligned.
, U2 a: l, c9 F; P+ d. D
& u( k/ r/ c" X3 s! p9 v7 M(j) Turn the wheel and make sure that the wheel is installed correctly.
# |0 Q; @' {5 R1 J, \" _8 x
" D* C. q) Y+ o# A' z5 |(k) Install the casing (9).
, n7 w+ F2 c# {9 Y; X/ \3 [* J# ?! N6 Q
(l) Install the bolts (5), the washers (2) and the new IPC-CSN (32-21-13-03-070) nuts (3) .
8 y( A1 U6 @+ A7 A: }4 H1 c8 x; p( {$ w- ~, n+ q4 P. H9 _
(m) TORQUE the nuts (3) to between 0.4 and 0.45 m.daN (35.40 and 39.82 lbf.in) and safety them with the new IPC-CSN (32-21-13-03-060) cotter pins (4) . 1 |* _0 @. c& k3 v7 X i' `
这是前轮安装工卡 请问红色的那句话怎么翻译 谢谢。 |
|