| 单词(默认显示当天的) | 采取的措施 |
| coupl | |
| Dead Reckon | |
| lubrication unit | |
| rod end | |
| idle power | |
| 尾喷 | |
| gusts | |
| hold open rod | |
| 电子设备舱 | |
| terrain awareness | |
| primary flow | |
| relay box. | |
| associated relay box. | |
| 忘校 | |
| Radar Beacon System | |
| the Air Traffic Control Radar Beacon System | |
| impemented | |
| float carburetors | |
| float carburetor | |
| Altimetry Conversion | |
| Metric Altimetry Conversion | |
| pins L | |
| airborne transponder | |
| flaps up maneuver speed | |
| ground-based | |
| airborne sensor | |
| VNAV guidance | |
| soft detent | |
| bump pushbuttons | |
| Retread LEVEL | |
| HYD POWER | |
| autothrust instinctive disconnect pushbutton | |
| autothrust instinctive disconnect | |
| autothrustinstinctive disconnect | |
| beta nut | |
| autothrust instinctive | |
| communication loss | |
| post-decision | |
| reverser latching lever | |
| TIANXIANG PROPOSAL | |
| T.L.A | |
| probes | |
| 标准知识 | |
| 维修行业 | |
| tire-ground contact | |
| tire-ground | |
| carbon block\ | |
| rods, | |
| 驾驶舱话筒 | |
| loose connector | |
| lever dual throttle resolver | |
| safety objectivity | |
| safety objective | |
| dual throttle resolver | |
| motorised movement | |
| fixed throttle | |
| precautiom | |
| finer pitch | |
| visocosity | |
| stress, marks, dents, bumps, creases, gouges | |
| coeffient | |
| bowl, | |
| flange ported | |
| type of corrosion protection | |
| 定期 | |
| attentionof | |
| tustin | |
| needst | |
| Airborne Systems and Equipment Certification | |
| 锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷 | |
| pumping elements | |
| mbu | |
| pumping elements | |
| Precautions | |
| 锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟较诧拷 | |
| flange port | |
| flange ports | |
| Opposes | |
| DO-178 | |
| 守听 | |
| RTCA/DO-178 | |
| fluied | |
| outflow front | |
| put the bonding plate and new gasket | |
| listening watch\ | |
| combustor drain valve | |
| combustor drain valve. | |
| fuel/oil heat exchanger | |
| positions | |
| pretractor | |
| imprdgnated | |
| RTCA activity | |
| 自我介绍 | |
| usege | |
| the bleed air joint duct | |
| dusege | |
| bleed air joint duct | |
| bleed-air joint duct | |
| NATION AIRCRAFT | |
| STARTERGENERATORAPU | |
| Usage range | |
| national aircraft | |
| stary capacitance | |
| HARNESS-HJ8 | |
| initiated | |
| RFIS | |
| inderture | |
| separate units | |
| carbon block assembly | |
| Back Draft Finger Seal | |
| BUSHING, SLEEVE-IN-BORE | |
| CFRP monolithic | |
| combustibale | |
| conbustibale | |
| ck. | |
| feather detent | |
| allocated | |
| standard missed approach | |
| execute standard approach | |
| Flight Control Lock System | |
| circuit breaker panel | |
| Fuel System Caution/Warning Panel | |
| dynamic table | |
| Aviation Weather Center | |
| shutdown drill | |
| aviation side | |
| Trimming Stabilizer | |
| propeller forces | |
| Trimming (Variable Incidence) Stabilizer | |
| Advancing Mobility | |
| grounded electrically | |
| Total 92.2 US Gal | |
| autorotation altitude call-outs | |
| ignition system A | |
| useful load N/A | |
| return system | |
| Incorporated within these standards | |
| Typical Empty | |
| Typical Empty IFR Equipped Weight N/A | |
| Electronic Functional Diagram | |
| Split Configuration | |
| Split (Dual) Configuration | |
| Lube System Schematic | |
| change trim | |
| jet upsets | |
| operational performance standards | |
| High Altitude Clear Air Turbulence | |
| FIRST-OFF | |
| FUEL TRANSFER | |
| combined fuel transfer rate | |
| clearance heading | |
| SUbjet | |
| exccessive | |
| downtrack waypoint | |
| low level wind advisory | |
| liwas | |
| bearing ,race | |
| bays | |
| 净空条件差 | |
| 机场净空条件差 | |
| 机场净空条件较差 | |
| CYLINDER ACTOR | |
| bearing and race | |
| QAR disk | |
| pseudo-radar | |
| civil endeavor | |
| muster warn | |
| 塔康天线 | |
| fix legs | |
| accoustical | |
| accoustical panels | |
| radius to a fix legs | |
| permaswedge | |
| overview role | |
| Fouled | |
| detent in | |
| lead-fouled | |
| driven fuel pump | |
| high-end reference | |
| Noverbmer | |
| IDENT。 | |
| original copy | |
| fedace | |
| 单发陆地 | |
| recommedation | |
| electronic compartment ventilation | |
| electronic compartment ventilation inlet/outlet | |
| access platform 1.6 m | |
| benzent | |
| 可研报告 | |
| expree | |
| expreely | |
| AGB bracket | |
| 资金到位 | |
| summarise | |
| plastics bushing | |
| plastics bushings | |
| 发改委 | |
| p86892-4 | |
| FUEL IN tube | |
| walk-around | |
| HP tube | |
| work-around | |
| work-around inspection | |
| HMUs | |
| smoke coming out of the forward sump drain | |
| multi land rating | |
| 多发陆地等级 | |
| 昼间目视标准 | |
| Fan and low pressure speed | |
| 陆地等级 | |
| 签注 | |
| 仪表等级签注 | |
| edge margin value | |
| Aviation maintenance | |
| The control powers and schedules | |
| 机长负责制 | |
| 云帆 | |
| hydromechanical system | |
| powers and schedules | |
| control powers | |
| vectored | |
| schedules | |
| a hydromechanical system | |
| gaiga | |
| TRANSDUCER-VIBRATION | |
| 周转件 | |
| screwed ground | |
| Welding and Brazing | |
| NOISE 、 | |
| perspective Centre | |
| permitting testing | |
| thus permitting testing | |
| 50VU | |
| PYLON fire detector | |
| tyre pool | |
| VANES | |
| Aft Carry | |
| 左座 | |
| gate hole | |
| Lower Forward Carry | |
| 2100−4043−02 | |
| 6002em | |
| Blown fuse plugs | |
| Blown fuse plugs | |
| Blown fuse plugs | |
| Scratch Damage | |
| base cable | |
| Dispensing Payload | |
| Dispensing Payloads | |
| COMPLIANCE TITLE | |
| solenoid bridge | |
| solenoid operated bridge | |
| didicating | |
| Repair Principle | |
| Temporary Repair Principle | |
| purchase month | |
| perchase | |
| shunt system | |
| electrical harness | |
| drain mart | |
| ILLUSTRATED | |
| per region | |
| acceptable operation limits | |
| AVIONLOGIS | |
| frame hole | |
| open loom | |
| intermittent. | |
| - the fault can be intermittent. | |
| oil sestem | |
| Document Scope | |
| Tubes DM1172 | |
| Nacelles | |
| Tyre Maintenance | |
| DP SW | |
| FLTR DP SW | |
| CORRECTION/ | |
| CORRECTION/ADDITION/AMPLIFICATION | |
| dquib | |
| refuell | |
| passageway door | |
| pull-in coil | |
| momentary type | |
| attach fitting | |
| air solenoid valve | |
| hub diameter to tip diameter | |
| Removal of the EEC | |
| Scanning Procedure | |
| Ground Scanning Procedure | |
| 外侧传感器 | |
| trunnionearing | |
| Wire Continuity | |
| Wire Continuity Check | |
| cables | |
| Electrical Wire Harnesses | |
| Power Plant Electrical | |
| Set-up Information | |
| 2. Job Set-up Information | |
| 前缘襟翼过渡灯 | |
| 过度灯 | |
| 过渡灯 | |
| vapours | |
| 过热火警 | |
| 1KS1 | |
| Comsuming | |
| Intervain | |
| 短停 | |
| In logistics | |
| peripheral shield | |
| flap type | |
| hinged flap type | |
| control centre console | |
| THE PACK BAY | |
| pressure-switch | |
| fgms | |
| themes | |
| brsn | |
| 空客代表 | |
| mariner 9 | |
| RECLARE | |
| view looking normal | |
| 零下200度 | |
| CENT FUS | |
| SPAR 2 R | |
| NIC PROCESSOR MODULE | |
| COMPUTERUNIT | |
| MAIN WHEEL ASSY | |
| HEATEXCHANGERRH | |
| UNIT, INTEGRATED STANDBY INDICATOR | |
| Premier Deicer | |
| LEVEL SENSOR ASSY,POT | |
| scalar sum | |
| butterfly vavle | |
| forward overboard valve | |
| 机关部门 | |
| upply duct | |
| chipchaser | |
| chipachaser | |