航空论坛_航空翻译_民航英语翻译_飞行翻译

 找回密码
 注册
搜索
查看: 1231|回复: 2
打印 上一主题 下一主题

CFM56-7 BSV Jumper Plate [复制链接]

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
1#
发表于 2011-10-29 12:15:21 |只看该作者 |倒序浏览
游客,如果您要查看本帖隐藏内容请回复
附件: 你需要登录才可以下载或查看附件。没有帐号?注册

Rank: 9Rank: 9Rank: 9

2#
发表于 2011-10-29 12:16:22 |只看该作者
CFM56-7 BSV Jumper Plate
December 2000 WTT face to face CFMI / 1
[sketch of problem]
[graph, UG picture, photo, etc.]
Condition/Background:
Cause:
- BSV was removed from production CFM56-7
engines during first quarter, 2000
- Many CFM56-7 field engines still use BSV
- Need to support customer option of either eliminating or deactivating the BSV without making extensive hardware changes Customer has requested ability to remove the BSV on-wing.
CFM56-7 BSV Jumper Plate
December 2000 WTT face to face CFMI / 2
Mission
SCtraeatteema ceosntte:ffective solution that will allow the customer to remove the Burner
Staging Valve without compromising engine safety and performance.
Program requirements: Develop substantiation plan, analysis/component test,
CID preparation/submittal, FAA approval, hardware release
and delivery 1st quarter, 2001.
Technical requirements: Concept functions as BSV ‘open’, maintain fuel flow at
all power levels, park BSV electrical cables, and ‘cap’ fuel/
hydraulic lines at jumper-to-manifold interface.
Customer input: Simple hardware change, cost effective, and meet
delivery date.
Goals and
Requirements:
CFM56-7 BSV Jumper Plate
December 2000 WTT face to face CFMI / 3
CFM56-7 BSV Jumper Plate
December 2000 WTT face to face CFMI / 4
Machined Jumper Plate
“L” Parking Bracket
Dummy Electrical Connectors
CFM56-7 BSV Jumper Plate
December 2000 WTT face to face CFMI / 5
Dummy Electrical Connectors
“L” Parking Bracket
Machined Jumper Plate
Proposed Seal
CFM56-7 BSV Jumper Plate
December 2000 WTT face to face CFMI / 6
Status
• Engine test successfully completed - November
– back to back fuel system stability testing
– tubing and bracket vibratory characteristics
• Hardware release on track for end of 1st quarter
• Final “Hurdle”: Fuel Coking
- downstream hydraulic line (~8 inches) will be stagnant (upstream
will be blown and capped)
- BSV hydraulic line fuel coking recently discovered on another CFM
engine
- analysis and engine test to determine fuel tube temperatures
CFM56-7 BSV Jumper Plate
December 2000 WTT face to face CFMI / 7
Jumper
PlateWill
Sit Here
MANIFOLD,
FUEL (1898M35)
TUBE,
FUEL
(1898M38)
MANIFOLD,
FUEL
(1898M20)
CFM56-7 BSV Jumper Plate
December 2000 WTT face to face CFMI / 8
Summary
• BSV jumper plate on track to meet end of first quarter
commitment
• Working to resolve potential issue with fuel coking

使用道具 举报

Rank: 1

3#
发表于 2016-4-16 14:04:10 |只看该作者
法国恢复和

使用道具 举报

您需要登录后才可以回帖 登录 | 注册


Archiver|航空论坛 ( 渝ICP备10008336号 )

GMT+8, 2024-5-5 18:16 , Processed in 0.031200 second(s), 12 queries .

Powered by Discuz! X2

© 2001-2011 MinHang.CC.

回顶部