CFM HMU / HPSOV Switch
**** Hidden Message ***** February 2002 WTT face to face CFMI / Boeing Proprietary Information - Unauthorized Disclosure, Use, or Export are Prohibited 1<BR>HMU / HPSOV Switch<BR>CFMI / Boeing Proprietary Information - Unauthorized Disclosure, Use, February 2002 WTT face to face or Export are Prohibited<BR>HMU - HPSOV Indication System<BR>Background<BR>• HPSOV switch leading cause of HMU removals and D&C’s<BR>- On-wing switch replacement in place for containment<BR>- Committed to operators to intro fix by 4Q’01<BR>• Joint CFMI/Boeing/Honeywell team have studied design<BR>alternatives to increase reliability to acceptable level<BR>- SPST switch with A/C modification selected<BR>• SPST switch eliminates predominant failure mode via run<BR>reed deletion<BR>- “Latch on shutdown” constitutes 90% of removals<BR>- Other switch characteristics maintained as risk abatement<BR>• New HMU P/N (P08) creates one-way engine/aircraft<BR>interchangeability<BR>- SPST switch requires revised P5-2 card; revised card<BR>compatible with current or proposed switch<BR>Qualification Testing Status<BR>• Comprehensive test program completed that addressed<BR>potential field failure modes<BR>• Endurance testing for both run and shutdown modes<BR>• Bounce testing completed at 1.25X engine “g” levels with<BR>Boeing P5-2 card<BR>- No “flickering” light observed.<BR>• Prototype switch installed on development engine for<BR>endurance cycling<BR>- 4000 cycle endurance test with periodic switch monitoring<BR>successfully completed<BR>NC<BR>NO<BR>Arm<BR>NC<BR>NO<BR>Arm<BR>Proposed Switch Configuration<BR>Current Double Throw<BR>Proposed Single Throw<BR>Run contact eliminated<BR>Introduction Logistics<BR>• CFMI/Boeing/Honeywell launch team formed. Charter:<BR>Insure all documentation, hardware, service bulletins are<BR>available for smooth introduction of the revised HPSOV<BR>indication system into production and in-service aircraft<BR>• Introduction points chosen<BR>- P5-2 Circuit card:<BR>- A/C line No 1047 (complete)<BR>- SPST Switch (P08 HMU):<BR>- A/C line No 1077 -- Feb. ‘02 Aircraft delivery<BR>February 2002 WTT face to face CFMI / Boeing Proprietary Information - Unauthorized Disclosure, Use, or Export are Prohibited 3<BR>CFM56-7B HPSOV Field Plan<BR>• Boeing Production<BR>– Introduce new P5-2 panel circuit cards line # 1047 (Complete)<BR>– Introduce new SPST HMU (P08) line # 1077 (Feb 02 Del.)<BR>• Field retrofit of P5-2 circuit cards<BR>– 40 cards per week increasing to 60 per week Apr 2002 (2 cards per aircraft)<BR>– P5-2 Circuit Cards available for entire fleet in approximately 10 months<BR>– Boeing logistics focal identified and will work with CFM/HW<BR>– Customers “No Charge” Purchase Orders will be required<BR>Customer Contacts :<BR>• Bill Swearengin - Boeing Don Thurnquist - CFMi Inc<BR>• Francois Boitelet - CFMi SA Bob Chojnacki - Honeywell<BR>February 2002 WTT face to face CFMI / Boeing Proprietary Information - Unauthorized Disclosure, Use, or Export are Prohibited 4<BR>Interim HMU plan until P5-2 cards attain fleet penetration<BR>• Aircraft must be compatible with new SPST switch<BR>– Aircraft must have new P5-2 circuit<BR>– If new card is not available:<BR>– Convert P08 to P07 (CFMI SB 73-068; HW SB CHT1 - 73-0015)<BR>– In special cases, Boeing can provide a No Technical Objection for limited<BR>operation with the ENG VALVE CLOSED light on provided that proper<BR>operation of the HPSOV is confirmed. The operator will need to coordinate<BR>this with their regulatory agency for approval.<BR>– Shop return HMUs to remain P07 until Aug 2002<BR>– Airlines can elect to note on repair PO to upgrade to P08 (SPST)<BR>– HMU switch kits available “Free Of Charge” for airlines that wish to upgrade<BR>proactively<BR>CFM56-7B HPSOV Field Plan<BR>February 2002 WTT face to face CFMI / Boeing Proprietary Information - Unauthorized Disclosure, Use, or Export are Prohibited 5<BR>Interim HMU plan until P5-2 cards attain fleet penetration<BR>• Honeywell will continue to replace current switches at “No Charge”<BR>– 48 hours notice is required<BR>– Can be accomplished on-wing<BR>– P08 to P07 conversion if required (CFMI SB 73-068; HW SB CHT1<BR>- 73-0015)<BR>CFM56-7B HPSOV Field Plan<BR>OK<BR>OK<BR>OK<BR>Deliver as P08 - specified<BR>by Purchase Order<BR>P5-2 Module -1 or-2 P5-2 Module -3 or -4<BR>P08 on APL line<BR>number >1046<BR>Spare P08<BR>On APL Line<BR>number < 1047<BR>Lease Pool<BR>Remain P07<BR>Spare HMUs<BR>N/A<BR>Prime - HW FSE convert<BR>to P07 (S/B)<BR>Backup - Provide new P5 cards<BR>OK<BR>Deliver as P07 - specified<BR>by Purchase Order<BR>February 2002 WTT face to face CFMI / Boeing Proprietary Information - Unauthorized Disclosure, Use, or Export are Prohibited 6<BR>Retrofit Strategy<BR>• Hardware will be maintained for unscheduled use<BR>– Honeywell will have both switch configurations available<BR>– Boeing will have aircraft cards available at Spares Dist. Center<BR>– Boeing AOG system will support urgent orders<BR>• Spare engines will be delivered with P08 HMUs<BR>– Can be changed to P07 at customer request by Honeywell<BR>• CFMI lease pool engines will remain equipped with P07<BR>– Converted later in the program to allow for flexibility<BR>CFM56-7B HPSOV Field Plan<BR>February 2002 WTT face to face CFMI / Boeing Proprietary Information - Unauthorized Disclosure, Use, or Export are Prohibited 7<BR>Communication Plan<BR>CFMI Fleet Highlights Issued Dec 01<BR>Boeing Fleet Team Digest Article (FTD) update Issued Jan 02<BR>Review Field plan with WTT - Telecon Complete<BR>CFMI All Operator Wire Feb 2002<BR>Boeing Service Letter Feb 2002<BR>Release Boeing P5-2 S/B TBD<BR>Release CFMI SBs Feb 2002<BR>WTT Face To Face 5/6 Feb 2002<BR>CFM56-7B HPSOV Field Plan<BR>February 2002 WTT face to face CFMI / Boeing Proprietary Information - Unauthorized Disclosure, Use, or Export are Prohibited 8<BR>Summary<BR>• P5-2 circuit card will be FOC to customer<BR>• New switches/installation will be FOC to the customer<BR>• Logistics focal point identified and contact information<BR>to be published<BR>• AOG scenarios addressed<BR>• Your CFMI ATPMs and CSMs will be thoroughly<BR>engaged with customer specific field programs<BR>CFM56-7B HPSOV Field Plan<BR>February 2002 WTT face to face CFMI / Boeing Proprietary Information - Unauthorized Disclosure, Use, or Export are Prohibited 9<BR>Service Bulletin Summary<BR>CFM56-7B HPSOV Field Plan<BR>SB Intent Boeing SB CFM SB H/W SB<BR>On-wing sw N/A 73-037R2 CHT1 73-008R2<BR>replacement<BR>On-wing rev K N/A 73-061R1 CHT1 73-011<BR>sw replacement<BR>with wire support<BR>bracket<BR>Rework P5-2 737-28-1179 N/A N/A<BR>233A3202-28-02<BR>Introduce P08 N/A 73-067 CHT1 73-0014<BR>P08 to P07 N/A 73-068 CHT1 73-0015<BR>Conversion回复 1# 航空 的帖子
ArmProposed Switch Configuration
Current Double Throw
Proposed Single Throw
Run contact eliminated
Introduction Logistics
• CFMI/Boeing/Honeywell laun :victory: :victory: CFM HMU / HPSOV Switch
页:
[1]