- 注册时间
- 2011-11-30
- 最后登录
- 2011-11-30
- 在线时间
- 0 小时
- 阅读权限
- 10
- 积分
- 0
- 帖子
- 2
- 精华
- 0
- UID
- 10954

|
Installation of the wheel
0 S1 F/ R3 S/ l9 g1 I. A U, X2 n/ @6 g+ @% T+ }
(a) Clean the inner surface of the wheel bearings (surface that touches the axle). Do not apply grease on these surfaces. $ `' y* l/ g# Y- e& s
6 s+ x3 y& {5 k" c! U$ _
(b) Install the wheel, with the valve outboard, with a handling tool.
v: b0 M- n( M+ w' m(c) Remove the PROTECTOR NLG (J47548) ; W& o: O- |4 e9 b h; G5 M
( W2 Y! m- }+ y$ n (d) Apply a light coat of Material No. 04-004* (COMMON GREASES) or Material No. 04-022* (COMMON GREASES) or Material No. 04-035* (COMMON GREASES) on the axle. , ^7 E {6 g; ^& i, j7 H2 S. I4 \
# @- j4 M J- K(e) Install the axle nut (10). ( }" M+ i1 v3 S" o& E
- T* W) H5 N* ]$ s(f) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 21.80 m.daN (160.77 lbf.ft) with the ADAPTOR NLG (J47549) . 5 J ?* d2 W7 G3 J9 { c( v
& p @) Y b* N0 E(g) Prevent rotation of the wheel and loosen the axle nut (10). 4 I, h6 x' s1 w5 h+ T5 ]" L; [
$ N- ~) p) Q$ w z(h) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 10.85 m.daN (80.01 lbf.ft).
* U2 u$ p9 o" E( A) [ g) b) j) q; S* _( F
(i) Tighten the axle nut (10) until the holes for the bolts (5) are aligned.
% g4 B: J& y# T: p& I5 v6 a2 m- @% [& k: X' w
(j) Turn the wheel and make sure that the wheel is installed correctly.
: q6 x" G) W% C- D$ I1 i: C7 u
) X+ W R1 k4 Z. s1 |, ]0 w(k) Install the casing (9).
3 }( b7 _; p7 n/ }3 f+ S/ v' U& @7 r) N7 x8 C. K' Q/ B* _( D+ l! H
(l) Install the bolts (5), the washers (2) and the new IPC-CSN (32-21-13-03-070) nuts (3) .
1 n( D" J: c4 G+ l0 F m& D9 C* r' I. Y/ @ ]
(m) TORQUE the nuts (3) to between 0.4 and 0.45 m.daN (35.40 and 39.82 lbf.in) and safety them with the new IPC-CSN (32-21-13-03-060) cotter pins (4) . ) A) w, J3 y- y* k. N4 h5 y1 n
这是前轮安装工卡 请问红色的那句话怎么翻译 谢谢。 |
|