- 注册时间
- 2011-11-30
- 最后登录
- 2011-11-30
- 在线时间
- 0 小时
- 阅读权限
- 10
- 积分
- 0
- 帖子
- 2
- 精华
- 0
- UID
- 10954

|
Installation of the wheel
' E+ J6 u+ h% ^( B3 |
; U2 T$ m; }( G0 f) E9 }2 N(a) Clean the inner surface of the wheel bearings (surface that touches the axle). Do not apply grease on these surfaces.
; N" w; y+ }+ {9 W$ X
9 d% n8 ~) i/ }: @2 K( b(b) Install the wheel, with the valve outboard, with a handling tool.
# l+ ~( Z$ i% K. \# Q6 V(c) Remove the PROTECTOR NLG (J47548) + @) p" o9 ?5 q
: j) Y/ {( m( I8 d6 l3 _: B
(d) Apply a light coat of Material No. 04-004* (COMMON GREASES) or Material No. 04-022* (COMMON GREASES) or Material No. 04-035* (COMMON GREASES) on the axle. . ~1 L) J5 K Y; [) _
* z8 Y& ]# a* \# q" H/ t: ^+ k
(e) Install the axle nut (10).
! V% U/ N, P, M+ i+ a5 @) O2 v" C3 S+ I: X; q/ Y% \2 P0 Y
(f) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 21.80 m.daN (160.77 lbf.ft) with the ADAPTOR NLG (J47549) . $ F5 F+ z+ `: T4 T! L) A
9 c3 U9 x4 H: N' A6 Q
(g) Prevent rotation of the wheel and loosen the axle nut (10).
7 j& \, X3 Y/ O9 k/ {" w8 ~
w# j3 `. _$ Y/ ^! |/ x* Y) ?6 f(h) Turn the wheel in the direction of the axle nut rotation and TORQUE the axle nut (10) to 10.85 m.daN (80.01 lbf.ft).
: K& S4 P$ j* u- n9 R e r
# Y9 ?. s" a4 y- x4 z+ ~2 {/ ]: A(i) Tighten the axle nut (10) until the holes for the bolts (5) are aligned.
$ {' P8 C, p3 U% [ ]+ d2 D M# r! q& m! q& P
(j) Turn the wheel and make sure that the wheel is installed correctly. 8 \ y' R8 ~7 c4 c7 M3 c
# n( R" g9 M2 c; g8 _(k) Install the casing (9). 6 ~3 P8 E/ n. _9 R
: |' v. o0 l" Y
(l) Install the bolts (5), the washers (2) and the new IPC-CSN (32-21-13-03-070) nuts (3) . ' T- l M% r$ [: a* H6 M5 m
2 J6 {; W" G4 M# f3 X(m) TORQUE the nuts (3) to between 0.4 and 0.45 m.daN (35.40 and 39.82 lbf.in) and safety them with the new IPC-CSN (32-21-13-03-060) cotter pins (4) . 4 \) K6 s* |) W! w6 d& I4 g
这是前轮安装工卡 请问红色的那句话怎么翻译 谢谢。 |
|