航空论坛_航空翻译_民航英语翻译_飞行翻译

 找回密码
 注册
搜索
查看: 1010|回复: 4
打印 上一主题 下一主题

Bombardier_Challenger_Global_00-Circling_Approach [复制链接]

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
1#
发表于 2010-4-21 14:32:03 |只看该作者 |倒序浏览

Bombardier_Challenger_Global_00-Circling_Approach

 

游客,如果您要查看本帖隐藏内容请回复

附件: 你需要登录才可以下载或查看附件。没有帐号?注册

Rank: 9Rank: 9Rank: 9

2#
发表于 2010-4-21 17:11:11 |只看该作者
ROPAT
Sep 13/2004 Flight Crew Operating Manual Volume 1
REV 1 CSP 100-6 09-13-13
CL300_SOP_037
PF
PNF
“ ” CALL RESPONSE
Circling Approach (1 of 4)
Two Engines
Final approach fix
• Flaps 20, V REF + 20 kt, or
• Flaps 40, V REF + 10 kt
On course inbound
• Flaps 20
• V REF + 20 kt
• Gear down
• Before landing checklist
• Complete to flaps 40
IAF outbound
• Flaps 20
• V REF + 20 kt
Approaching IAF
• 3 min out 160 kt
• Flaps 10, gear up
• Approach checklist complete
Final approach
• Flaps 30 V REF
90°
15 SEC
15 SEC
Circling Approach (1 of 4)
Figure 09-13-04
ROPAT
Volume 1 Flight Crew Operating Manual Sep 13/2004
09-13-14 CSP 100-6 REV 1
CL300_SOP_038
PF
PNF
“ ” CALL RESPONSE
Circling Approach (2 of 4)
Two Engines
45°
1.53 mi
1.19 mi
15 SECONDS
15 SECONDS
Final approach
• V REF
Abeam end of runway
• Start timing (15 sec)
• Initiate base leg turn (30° bank)
• Begin descent at 45° point
Crosswind to downwind
• At 15 sec, turn to
downwind leg
• Use 30° bank angle
Entering crosswind
• Flaps 30
• Gear down
• V REF + 10 kt
• Start timing (15 sec)
Circling Approach (2 of 4)
Figure 09-13-05
ROPAT
Sep 13/2004 Flight Crew Operating Manual Volume 1
REV 1 CSP 100-6 09-13-15
CL300_SOP_039
PF
PNF
“ ” CALL RESPONSE
Circling Approach (3 of 4)
Two Engines
1.57 nm
1.3 nm
15 SECONDS
30 SECONDS
Final approach
• V REF
Abeam end of runway
• Start timing (15 sec), then
• Initiate base leg turn (30° bank)
• Begin descent at 45° point
Entering crosswind
• Initiate turn to
Downwind (30° bank)
Commencing circling maneuver
• Flaps 30
• Gear down
• V REF + 10 kt
• Begin 45° turn approx. 1 mi
from runway
• Start timing upon completion
of rollout on heading
Circling Approach (3 of 4)
Figure 09-13-06
ROPAT
Volume 1 Flight Crew Operating Manual Sep 13/2004
09-13-16 CSP 100-6 REV 1
CL300_SOP_040
PF
PNF
“ ” CALL RESPONSE
Circling Approach (4 of 4)
Two Engines
1.57 nm
1.3 nm
15 SECONDS
Final approach
• V REF
Abeam end of runway
• Start timing (15 sec), then
• Initiate base leg turn (30° bank)
• Begin descent at 45° point
Commencing circling
maneuver
• Flaps 30
• Gear down
• V REF + 10 kt
• Begin 270° turn to
downwind
Circling Approach (4 of 4)
Figure 09-13-07

使用道具 举报

Rank: 1

3#
发表于 2011-2-11 15:41:42 |只看该作者

MANUAL 8 MANUAL 8 MANUAL 8 MANUAL 8 MANUAL 8 MANUAL 8

MANUAL 8 MANUAL 8 MANUAL 8 MANUAL 8 MANUAL 8 MANUAL 8

使用道具 举报

Rank: 1

4#
发表于 2011-3-1 03:56:11 |只看该作者

好好学习

thank you

使用道具 举报

Rank: 1

5#
发表于 2011-7-31 10:30:52 |只看该作者
庞巴迪挑战者动力装置

使用道具 举报

您需要登录后才可以回帖 登录 | 注册


Archiver|航空论坛 ( 渝ICP备10008336号 )

GMT+8, 2024-7-1 11:35 , Processed in 0.015600 second(s), 12 queries .

Powered by Discuz! X2

© 2001-2011 MinHang.CC.

回顶部