航空论坛_航空翻译_民航英语翻译_飞行翻译

 找回密码
 注册
搜索
查看: 1310|回复: 3
打印 上一主题 下一主题

波音-737(BOEING-737)飞机维护手册——第25章——设备与装饰 [复制链接]

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
1#
发表于 2011-7-27 22:07:33 |只看该作者 |倒序浏览

波音-737(BOEING-737)飞机维护手册——第25章——设备与装饰

客舱设施改装(CABIN ACCOMMODATION CONVERSIONS)

驾驶舱(FLIGHT COMPARTMENT)

客舱(PASSENGER COMPARTMENT)

餐柜/厨房(BUFFET/GALLEY)

货舱与附件舱(CARGO AND ACCESSORY COMPARTMENTS)

应急设备(EMERGENCY EQUIPMENT)

游客,如果您要查看本帖隐藏内容请回复

附件: 你需要登录才可以下载或查看附件。没有帐号?注册

Rank: 9Rank: 9Rank: 9

2#
发表于 2011-7-27 22:12:30 |只看该作者
INTERIOR MATERIALS.............................................................................................. 25-00-11
Maintenance Practices
CABIN ACCOMMODATION CONVERSIONS............................................................... *[3] 25-09-100
Description and Operation
All-Cargo Configuration
All-Passenger Configuration
Cargo Accommodation
Combined Configurations
Emergency Equipment
Passenger Accommodation
Conversions Between the All-Passenger and the All-Cargo
Configuration............................................................................................................ *[2] 25-09-111
Conversions Between the All-Passenger and the Combined
Passenger/Cargo Configurations............................................................................. *[2] 25-09-121
Conversions Between the Combined Passenger/Cargo
Configurations and the All-Cargo Configurations .................................................... *[2] 25-09-131
Conversions Between the Combined Passenger/Cargo
Configurations.......................................................................................................... *[2] 25-09-141
Conversions Between the All-Passenger
Configurations.......................................................................................................... *[4] 25-09-151
FLIGHT COMPARTMENT.............................................................................................. 25-10-0
Description and Operation
CAPTAIN'S AND FIRST OFFICER'S EQUIPMENT................................................... 25-11-0
Description and Operation
Forward and Aft Electronic Control Panel
Lightshield
Main Instrument Panels
Captain's and First Officer's Seats
Captain's and First Officer's Side Panels
Captain's and First Officer's Seats........................................................................... 25-11-11
Removal/Installation
BOEING PROPRIETARY - Copyright © - Unpublished Work - See title page for details.
Subject Subject No.
Lightshield ................................................................................................................ 25-11-21
Removal/Installation
Seat Adjustment Sight Guide................................................................................... 25-11-31
Maintenance Practices
OBSERVERS' EQUIPMENT....................................................................................... 25-14-0
Description and Operation
First Observer's Auxiliary Panel
First Observer's Seat
First Observer's Seat ............................................................................................... 25-14-11
Removal/Installation
CONTROL CABIN STOWAGE PROVISIONS............................................................ 25-15-0
Description and Operation
LINING AND INSULATION......................................................................................... 25-16-0
Description and Operation
Control Cabin Lining ................................................................................................ 25-16-11
Removal/Installation
Control Cabin Insulation........................................................................................... 25-16-21
Removal/Installation
Approved Repairs
Control Cabin Drip Pan ............................................................................................ 25-16-31
Removal/Installation
Control Cabin Crash Padding .................................................................................. 25-16-41
Removal/Installation
CONTROL CABIN MISCELLANEOUS EQUIPMENT ................................................ 25-19-0
Description and Operation
Subject Subject No.
PASSENGER COMPARTMENT.................................................................................... 25-20-0
Description and Operation
PASSENGER CABIN ARRANGEMENT LIMITATIONS............................................. 25-20-100
Description and Operation
PASSENGER CABIN LINING AND INSULATION ..................................................... *[5] 25-21-300
Description and Operation *[7] 25-21-301
Ceiling Lining
Curved Ceiling Panels
Lowered Ceiling Panels
Ceiling Support Structure
Ceiling Center Support
Overhead Support Structure System
Passenger Cabin Insulation
Sidewall Lining
Window Panel .......................................................................................................... *[12] 25-21-311
Removal/Installation
Window Shade......................................................................................................... *[7] 25-21-312
Removal/Installation *[5] 25-21-313
Cleaning/Painting
Approved Repairs
Window Reveal ........................................................................................................ 25-21-314
Cleaning/Painting
Air Return Grille ....................................................................................................... *[5] 25-21-315
Removal/Installation
Carpet Riser Panel................................................................................................... *[5] 25-21-321
Removal/Installation
Sidewall Lining Panels (Aft Entry and Aft Service Doorways) ................................. 25-21-325
Removal/Installation
Sidewall Lining Panels (Forward Entry Doorway).................................................... 25-21-331
Removal/Installation
Sidewall Lining Panels (Forward Galley Doorway).................................................. 25-21-335
Removal/Installation.
Subject Subject No.
Sidewall Insulation ................................................................................................... 25-21-339
Removal/Installation
Approved Repairs
Curved Ceiling Panel ............................................................................................... *[5] 25-21-341
Maintenance Practices
Removal/Installation
Adjustment/Test
Sculptured Ceiling Panel.......................................................................................... *[7] 25-21-345
Removal/Installation
Adjustment/Test
Sidewall Panels........................................................................................................ *[7] 25-21-346
Removal/Installation
Insulation Blanket..................................................................................................... 25-21-347
Removal/Installation
Ceiling Insulation...................................................................................................... 25-21-349
Removal/Installation
Approved Repairs
Forward Lowered Ceiling Panels ............................................................................. *[4] 25-21-351
Removal/Installation *[2] 25-21-352
Aft Lowered Ceiling Panels...................................................................................... *[4] 25-21-361
Removal/Installation *[2] 25-21-362
Lowered Ceiling Panels ........................................................................................... *[7] 25-21-371
Removal/Installation
Overhead Structure System..................................................................................... *[10] 25-21-581
Removal/Installation
PASSENGER SEATS................................................................................................. 25-22-0
Description and Operation
Baggage Restraints
PASSENGER SERVICE UNITS................................................................................. *[5] 25-23-0
Description and Operation *[7] 25-23-01
Attendants' Service Units
Lavatory Service Units
Passenger Cabin Service Units
Subject Subject No.
Forward Lavatory Service Unit................................................................................. *[4] 25-23-31
Removal/Installation *[2] 25-23-32
Aft Lavatory Service Unit ......................................................................................... *[6] 25-23-41
Removal/Installation
Forward Cabin Attendants’ Service Unit.................................................................. *[6] 25-23-61
Removal/Installation
Aft Cabin Attendants’ Service Unit........................................................................... *[6] 25-23-71
Removal/Installation
Attendant and Lavatory Service Units ..................................................................... *[7] 25-23-131
Removal/Installation
Passenger Service Units.......................................................................................... *[2] 25-23-311
Maintenance Practices
Lowering and Raising
Removal/Installation
Adjustment/Test
Cleaning/Painting
Approved Repairs
Passenger Service Units.......................................................................................... *[10] 25-23-511
Maintenance Practices
Lower PSU or Spacer Panel
Raise PSU or Spacer Panel
Remove PSU or Spacer Panel
Install PSU or Spacer Panel
Cleaning/Painting
Passenger Service Units.......................................................................................... *[7] 25-23-611
Maintenance Practices
PSU Removal/Installation
Spacer Panel Removal/Installation
PASSENGER CABIN PARTITIONS AND COMPARTMENTS................................... 25-24-0
Description and Operation
Closet
Windscreens
Forward Left Windscreen......................................................................................... *[8] 25-24-112
Removal/Installation
Forward Right Windscreen ...................................................................................... *[6] 25-24-123
Removal/Installation
Aft Left Windscreen.................................................................................................. *[9] 25-24-131
Removal/Installation
BOEING PROPRIETARY - Copyright © - Unpublished Work - See title page for details.
Subject Subject No.
Aft Left Windscreen.................................................................................................. *[2] 25-24-133
Removal/Installation
Aft Windscreen......................................................................................................... *[7] 25-24-144
Removal/Installation
Cargo/Passenger Dividing Partition......................................................................... *[2] 25-24-152
Removal/Installation
Overhead Stowage Compartment ........................................................................... *[2] 25-24-311
Removal/Installation
Overhead Stowage Bin ............................................................................................ *[7] 25-24-313
Removal/Installation
Adjustment/Test
Overhead Stowage Bin Door ................................................................................... *[7] 25-24-314
Maintenance Practices
Door Removal/Installation
Hinge Assembly Removal/Installation
Latch Assembly Removal/Installation
Opening Overhead Stowage Bin Which
Failed Closed
Cabin Temperature Sensor Air Inlet Grille............................................................... *[5] 25-24-315
Removal/Installation
Aft Centerline Stowage Closet................................................................................. 25-24-381
Removal/Installation
Carry-All Compartments .......................................................................................... *[10] 25-24-511
Maintenance Practices
Carry-All Compartment End Cap ............................................................................. *[10] 25-24-512
Removal/Installation
PASSENGER CABIN ATTENDANTS' STATIONS..................................................... 25-25-0
Description and Operation
Attendants' Aft Station
Attendants' Galley Stations
Attendants' Forward Station
Forward Attendants' Seat ........................................................................................ 25-25-12
Removal/Installation
Inspection/check
PASSENGER CABIN FLOOR COVERING................................................................ 25-27-0
Description and Operation
Subject Subject No.
CARPETS ................................................................................................................... 25-27-100
Description and Operation
Removal/Installation
ENTRANCE AND SERVICE AREA FLOOR COVERING.......................................... 25-27-200
Description and Operation
Entry and Service Area Mats ................................................................................... 25-27-211
Removal/Installation
PASSENGER CABIN MISCELLANEOUS EQUIPMENT ........................................... 25-29-0
Description and Operation
Literature Stowage
Thermometer
Vacuum Cleaner Receptacle
BUFFET/GALLEY
GALLEYS.................................................................................................................... *[6] 25-31-0
Description and Operation
Electrical Service
Floor Covering
Galley No. 1
Galley No. 2
Galley No. 3
Galley No. 4
Water Service
GALLEYS.................................................................................................................... *[11] 25-31-01
Description and Operation
Electrical Service
Floor Covering
Forward Galleys
Galley No. 4
Water Service
Forward Galley......................................................................................................... 25-31-51
Removal/Installation
Aft Galley.................................................................................................................. 25-31-61
Removal/Installation
Forward Galley Decorative Panel ............................................................................ 25-31-151
Removal/Installation
Aft Galley Decorative Panel ..................................................................................... 25-31-161
Removal/Installation
Forward Galley Header Assembly ........................................................................... 25-31-251
Removal/Installation
BOEING PROPRIETARY - Copyright © - Unpublished Work - See title page for details.
Galley Header .......................................................................................................... 25-31-261
Removal/Installation
LAVATORIES.............................................................................................................. 25-40-0
Description and Operation
Aft Lavatory Partitions
Ceiling Panel
Dispenser Cabinet
Disposal Cabinet
Door and Header
Floor Covering
Forward Lavatory Partition
Miscellaneous Equipment
Sidewall Panel
Inspection/Check
Lavatory Sink Cabinet.............................................................................................. 25-40-1
Removal/Installation
Forward Lavatory Partition....................................................................................... 25-40-2
Removal/Installation
Forward Lavatory Door and Header ........................................................................ 25-40-3
Removal/Installation
Forward Lavatory Sidewall Panel ............................................................................ 25-40-4
Removal/Installation
Forward Lavatory Ceiling Panel............................................................................... 25-40-5
Removal/Installation
Aft Lavatory Partition................................................................................................ 25-40-6
Removal/Installation
Aft Lavatory Door and Header ................................................................................. 25-40-7
Removal/Installation
Aft Lavatory Sidewall Panel ..................................................................................... 25-40-8
Removal/Installation
Aft Lavatory Ceiling Panel........................................................................................ 25-40-9
Removal/Installation
Dispenser Cabinet Assembly................................................................................... 25-41-11
Removal/Installation
Disposal Cabinet Assembly ..................................................................................... 25-42-11
Removal/Installation
Toilet Upper Shroud................................................................................................. 25-42-12
Removal/Installation
BOEING PROPRIETARY - Copyright © - Unpublished Work - See title page for details.
CARGO AND ACCESSORY COMPARTMENTS
ELECTRONIC COMPARTMENT................................................................................ 25-51-0
Description and Operation
Electronic Compartment Drip Pan and Moisture Shroud............................................ 25-51-01
Removal/Installation
Inspection/Check
CARGO COMPARTMENTS ....................................................................................... 25-52-0
Description and Operation
Anchor Plates
Blowout Panels
Lining
Pressure Equalization Valves
Tiedown Tracks
Webbing
Cleaning and Painting
Cargo Compartment Deck Panels ........................................................................... 25-52-51
Removal/Installation
CARGO COMPARTMENT LINING AND INSULATION ............................................. 25-52-100
Description and Operation
Insulation
Lining
Inspection/Check
Approved Repairs
Ceiling Lining............................................................................................................ 25-52-111
Removal/Installation
Sidewall Lining ......................................................................................................... 25-52-123
Removal/Installation
Bulkhead Lining ....................................................................................................... 25-52-131
Removal/Installation
Insulation.................................................................................................................. 25-52-141
Removal/Installation
Approved Repairs
BOEING PROPRIETARY - Copyright © - Unpublished Work - See title page for details.
MAIN CABIN CARGO EQUIPMENT .......................................................................... *[2] 25-56-0
Description and Operation
Cargo Carrying System
Transfer Panels, or Ball Mats
Roller Trays
Side Restraint Guides
Guide Rails
Retractable Side Guides
Pallet Locks
Pallet Brakes
Aft Stops
Threshold Assembly
Cargo Barrier Net
Sidewall Protector Panels
Transfer Panel ......................................................................................................... *[2] 25-56-11
Removal/Installation
Roller Tray................................................................................................................ *[2] 25-56-21
Removal/Installation
Guide Rail Assemblies............................................................................................. *[2] 25-56-31
Removal/Installation
Retractable Side Guides .......................................................................................... *[2] 25-56-41
Removal/Installation
Side Restraint Guides .............................................................................................. *[2] 25-56-51
Removal/Installation
Pallet Locks.............................................................................................................. *[2] 25-56-61
Removal/Installation
Pallet Brakes............................................................................................................ *[2] 25-56-71
Removal/Installation
Aft Stops................................................................................................................... *[2] 25-56-81
Removal/Installation
Threshold Assembly ................................................................................................ *[2] 25-56-91
Removal/Installation
Adjustment/Test
Cargo Barrier Net..................................................................................................... *[2] 25-56-112
Removal/Installation
Sidewall Protector Panels ........................................................................................ *[2] 25-56-131
Removal/Installation
EMERGENCY EQUIPMENT.......................................................................................... 25-60-0
Description and Operation
ESCAPE EQUIPMENT ............................................................................................... 25-61-0
Description and Operation
ESCAPE ROPES/STRAPS (PASSENGER CABIN) .................................................. 25-61-100
Description and Operation
Removal/Installation
Inspection/Check
ESCAPE ROPES/STRAPS (CONTROL CABIN) ....................................................... 25-61-200
Description and Operation
Removal/Installation
Inspection/Check
ESCAPE SLIDE ASSEMBLY (DOOR-MOUNTED).................................................... 25-61-300
Description and Operation
Removal/Installation
Escape Slide Battery................................................................................................ 25-61-312
Inspection/Check
Escape Slide Package (Door-Mounted) .................................................................. 25-61-311
Removal/Installation
Inspection/Check
Escape Slide Floor Brackets.................................................................................... 25-61-332
Maintenance Practices
LIFESAVING EQUIPMENT ........................................................................................ 25-62-0
Description and Operation
EMERGENCY SIGNALLING EQUIPMENT................................................................ 25-63-0
Description and Operation
MISCELLANEOUS EMERGENCY EQUIPMENT....................................................... 25-69-0
Description and Operation
*[1] Standard Passenger Airplanes
*[2] Passenger/Cargo Convertible Airplanes
*[3] GJ B-2501 thru B-2503
*[4] Standard Passenger Airplanes without ATI Interior
*[5] Wide-Body Look and Carry-All Compartment Interior
*[6] ALL EXCEPT Airplanes with ATI Interior
*[7] ATI Interior
*[8] Airplanes with Forward Left Windscreen
*[9] Standard Passenger Airplanes without ATI Interior
*[10] Carry-All Compartment Interior
*[11] Airplanes with ATI Interior
*[12] Wide-Body Look Interior

使用道具 举报

Rank: 1

3#
发表于 2011-7-28 18:57:48 |只看该作者
波音-737(BOEING-737)飞机维护手册——第25章——设备与装饰

使用道具 举报

Rank: 1

4#
发表于 2012-2-28 16:41:34 |只看该作者
进来看看,谢谢分享

使用道具 举报

您需要登录后才可以回帖 登录 | 注册


Archiver|航空论坛 ( 渝ICP备10008336号 )

GMT+8, 2024-12-23 09:00 , Processed in 0.026001 second(s), 12 queries .

Powered by Discuz! X2

© 2001-2011 MinHang.CC.

回顶部