How did the crew manage or mismanage the threat?fficeffice" />
T 1 Runway and taxiway construction on
their departing runway (final ffice:smarttags" />2000’)
4 1 No Threat mismanaged — CA failed to talk about the construction and
closures in his brief. No plans in place in the event of a RTO.
T 2 Late ATC runway change — changed
runway to 24R from 25L due to a slow
moving aircraft on 25L
50 4 Yes Threat managed — CA reprogrammed the FMC, handled the
radios, and placed emphasis on the FO to fly the aircraft.
T 3 ATC called back and told the crew that
it was at their discretion to land on 24R
or 25L
50 4 Yes Threat managed — CA asked for the FO’s preference. They
mutually decided to continue the approach into 24R because it was
already in the box.
T 4 Heavy congestion going into LAX 3 4 Yes Threat managed — The crew closely monitored the traffic with
the help of ATC and TCAS. |